Atm Construction
- Based in
- Berkeley
- On San Francisco permits
- Jan 2001 to Jul 2026
- Last 24 months
- 1 permit filed
50 permits since 2000: 32 completed, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 1 days from filing to permit and 121 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2024 | Completed final sign-off Dec 2024 | 475 Warren Dr | repair (2)deck less than 50% to comply with nov; 202422660 item #2.Details
repair (2)deck less than 50% to comply with nov; 202422660 item #2. | $500 |