Back to kitchen remodel contractors
At6 Design Build
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Apr 2026
- Last 24 months
- 5 permits filed
89 permits since 2000: 77 completed, 2 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
34 kitchen remodel permits: 30 completed, 1 never finaled, 3 expired or cancelled. Typically 6 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2026 | Completed final sign-off Sep 2026 | 539 Noe St | remodel upper unit at existing 2 unit dwelling. work to include 60 sq ft addition at level 2 (upper unit) with new bathroom plus a kitchen renovation.Details
remodel upper unit at existing 2 unit dwelling. work to include 60 sq ft addition at level 2 (upper unit) with new bathroom plus a kitchen renovation. | $160,000 |
| Dec 23, 2024 | Completed final sign-off Mar 2026 | 148 Highland Av | 114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/hDetails
114 sf addition at lvl 1. convert 30 sf of unconditioned garage space to conditioned living space, kitchen & bathroom renovation including filling in lightwell at level 2. lvl 2: new door & windows & replacing 1 door lvl 1: rear facade replacing (1) door. add 2 skylights. n)furnance & tankless w/h | $189,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2025 | 2929 20th Av | interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) totalDetails
interior remodel to existing sfd. work to include kitchen rennovation, (1) bathroom remodel, (1) new bathroom and window replacements at the side (6) total | $85,000 |
| Nov 14, 2023 | Completed final sign-off Jul 2025 | 3771 Clay St | remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under.Details
remodel (e) kitchen renovation, (3) bathroom renovations, window replacements at rear and sash replacements at front elevation, (3) skylights at (e) openings. (n) heating and water heater upgrades. minor 'fill in' at level 1 under. | $438,000 |
| Jun 16, 2023 | Completed final sign-off Jul 2024 | 729 Congo St | interior remodel of 1-kitchen and 2-baths, installation of a/c and new outdoor shower at level 4 deck.Details
interior remodel of 1-kitchen and 2-baths, installation of a/c and new outdoor shower at level 4 deck. | $80,000 |
| Sep 16, 2022 | Completed final sign-off Mar 2025 | 149 Hartford St | remodel to existing two family residence, work to include converting 120sf of garage to condition kitchen/pantry, minor fill in addition at rear (27sf) for storage interior remodel to include kitchen (total 2), 3 baths, new deck exterior stairs at rearDetails
remodel to existing two family residence, work to include converting 120sf of garage to condition kitchen/pantry, minor fill in addition at rear (27sf) for storage interior remodel to include kitchen (total 2), 3 baths, new deck exterior stairs at rear | $350,000 |
| Jun 10, 2022 | Completed final sign-off Jun 2024 | 225 Edgehill Wy | (e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row.Details
(e) hipped roof reframing and replacement. interior renovation of (e) kitchen including removal of interior walls. front door replacement. replace rear windows and doors all other work not visible from public row. | $187,000 |
| May 27, 2022 | Expired or cancelled withdrawn Jun 2022 | 225 Edgehill Wy | partial replacement, in kind of (e)hipped roof reframing at rear of building (north + north east elevation) front door replacement. window replacements. window replacements at rear and weat side (no impact on public right of way). interior renovation of existing kitchen including removal of interiorDetails
partial replacement, in kind of (e)hipped roof reframing at rear of building (north + north east elevation) front door replacement. window replacements. window replacements at rear and weat side (no impact on public right of way). interior renovation of existing kitchen including removal of interior | $150,000 |
| Jul 13, 2020 | Completed final sign-off Apr 2021 | 134 Taraval St | interior remodel to (e) sfd. remodel of kitchen and 5 bathrooms, rebuild stair to level 1. new french door at family room, new egress window at bedroom 3 and fill in existing door at level 1. replace 3 windows and fill in one window at the kitchen (level 2). fill in one window at master bedroom atDetails
interior remodel to (e) sfd. remodel of kitchen and 5 bathrooms, rebuild stair to level 1. new french door at family room, new egress window at bedroom 3 and fill in existing door at level 1. replace 3 windows and fill in one window at the kitchen (level 2). fill in one window at master bedroom at | $180,000 |
| Jul 8, 2020 | Expired or cancelled cancelled Jul 2020 | 134 Taraval St | 7remodel of kitchen & 3 bathrms, rebuild stair to level 1, new door to rear yard. new french door at family room, new egress window at bedrm 3 & fill in (e) door at level 1. replace 3 windows & fill in one window at kitchen (level 2). fill in one window at master bedrm at level 3.Details
7remodel of kitchen & 3 bathrms, rebuild stair to level 1, new door to rear yard. new french door at family room, new egress window at bedrm 3 & fill in (e) door at level 1. replace 3 windows & fill in one window at kitchen (level 2). fill in one window at master bedrm at level 3. | $180,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2022 | 2561 Washington St | remodel kitchen and 3.5 bathrooms, remove 33 sf floor area & replace 3 windows and 2 door units. no exterior work visible from street, convert bedroom & master closet, including adding non-bearing partitions.Details
remodel kitchen and 3.5 bathrooms, remove 33 sf floor area & replace 3 windows and 2 door units. no exterior work visible from street, convert bedroom & master closet, including adding non-bearing partitions. | $268,000 |
| Feb 11, 2020 | Completed final sign-off Mar 2021 | 60 Pearl St | small additoin at e lightwell at lvel 2 and interior remodel to unit 60a and 62. work to include kitchen and bath remodel at levels 2 and 3Details
small additoin at e lightwell at lvel 2 and interior remodel to unit 60a and 62. work to include kitchen and bath remodel at levels 2 and 3 | $140,000 |
| Feb 11, 2020 | Completed final sign-off Nov 2020 | 121 Lower Tr | interior remodel, work to include partial kitchen and powder remodel, new closet at e bedroom, convert living rm to 2nd bedroom, refinish e wood flDetails
interior remodel, work to include partial kitchen and powder remodel, new closet at e bedroom, convert living rm to 2nd bedroom, refinish e wood fl | $55,000 |
| May 7, 2019 | Completed final sign-off Feb 2020 | 37 Aztec St | remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof.Details
remodel to sfr. work to include rmeodel to level 1 bath, rmeodel kitchen, new windows at west and rear (not visible from street), lightwell infill (not visible from st). new roof. | $95,000 |
| Mar 12, 2019 | Completed final sign-off Feb 2020 | 769 Clayton St | interior remodel to e residence. work to include new flooring at level 2 and 3, remodel 2 baths, powder rm, kitchen and master bath to level 3. small extension at lvel 1 media room and rebuild e deck at level 1Details
interior remodel to e residence. work to include new flooring at level 2 and 3, remodel 2 baths, powder rm, kitchen and master bath to level 3. small extension at lvel 1 media room and rebuild e deck at level 1 | $244,000 |
| Jan 29, 2019 | Completed final sign-off Aug 2019 | 747 Natoma St | unit #203: interior remodel of extg 1 story plus loft residential unit on top floor. work include new finishes throughout, including kitchen and bathroom, fixtures and finishes, nw guardrail, fireplace surround, and fireplace insert. n/a for maherDetails
unit #203: interior remodel of extg 1 story plus loft residential unit on top floor. work include new finishes throughout, including kitchen and bathroom, fixtures and finishes, nw guardrail, fireplace surround, and fireplace insert. n/a for maher | $43,000 |
| Mar 5, 2018 | Completed final sign-off Jun 2018 | 468 Hazelwood Av | kitchen remodel to extg s.f.d. to include new linen closet at extg bathroom and new gas insert at extg fire place.Details
kitchen remodel to extg s.f.d. to include new linen closet at extg bathroom and new gas insert at extg fire place. | $11,000 |
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 235 Yerba Buena Av | interior remodel to include conditioning e space at gr fl to include 2 bedrooms, 1 full bath, 1 new bath, kitchen remodel, bathrooms remodelDetails
interior remodel to include conditioning e space at gr fl to include 2 bedrooms, 1 full bath, 1 new bath, kitchen remodel, bathrooms remodel | $152,000 |
| Feb 16, 2017 | Completed final sign-off Nov 2017 | 50 Arnold Av | revision to pa 2016-1223-5859 - remove non load bearing wall between kitchen & dining room. new cabinets, finishes & fixtures at existing locations in kitchen. new fixtures & finishes at 2nd floor bathroomDetails
revision to pa 2016-1223-5859 - remove non load bearing wall between kitchen & dining room. new cabinets, finishes & fixtures at existing locations in kitchen. new fixtures & finishes at 2nd floor bathroom | $40,000 |
| May 18, 2016 | Completed final sign-off Oct 2018 | 219 Douglass St | interior remodel, including new kitchen, new bathroom, and new windows, windows not facing street.Details
interior remodel, including new kitchen, new bathroom, and new windows, windows not facing street. | $175,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 2040 Leavenworth St | replace fixtures, appliances & cabinets in kitchen; replace 2 toilets & vanities; replace floor tile in 2 bathrooms; add laundry hookups in (e) closet (electrical dryer-no gas), dryer vent but not to exceed 14' w/o booster; (e) lights to remain, (n) fan @ bathroom w/humidifier to terminateDetails
replace fixtures, appliances & cabinets in kitchen; replace 2 toilets & vanities; replace floor tile in 2 bathrooms; add laundry hookups in (e) closet (electrical dryer-no gas), dryer vent but not to exceed 14' w/o booster; (e) lights to remain, (n) fan @ bathroom w/humidifier to terminate | $25,000 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 798 Green St | revision to app#201510220523. revised work to incude new bed niche at m. bedroom, new door opening between dining and bedroom, and remove extg bearing wall at kitchen and install new island.Details
revision to app#201510220523. revised work to incude new bed niche at m. bedroom, new door opening between dining and bedroom, and remove extg bearing wall at kitchen and install new island. | $7,500 |
| Nov 24, 2015 | Completed final sign-off Nov 2016 | 3731 20th St | remodel kitchen & bathroom on 1st floor of (e) s.f. r. work to include (n) fixtures & finishes. also replace (e) ceiling light @ hallway.Details
remodel kitchen & bathroom on 1st floor of (e) s.f. r. work to include (n) fixtures & finishes. also replace (e) ceiling light @ hallway. | $50,000 |
| Nov 24, 2015 | Completed final sign-off Nov 2016 | 3731 20th St | replacement of existing door @ dining room, relocation of existing door at kitchen as well as replacement & relocation of window @ kitchen.Details
replacement of existing door @ dining room, relocation of existing door at kitchen as well as replacement & relocation of window @ kitchen. | $9,500 |
| Oct 22, 2015 | Completed final sign-off Oct 2016 | 798 Green St | kitchen and 2 bathrooms remodel. work to include new flooring and lighting throughtout. replace extg skylight. replace extg lightwell windows that are not visible from street.Details
kitchen and 2 bathrooms remodel. work to include new flooring and lighting throughtout. replace extg skylight. replace extg lightwell windows that are not visible from street. | $140,000 |
| Sep 2, 2015 | Completed final sign-off Aug 2016 | 798 Green St | exploratory demolition/removal of existing drywall at kitchen, laundry and living room to verify existing structural framing. remodel work under separate permit.Details
exploratory demolition/removal of existing drywall at kitchen, laundry and living room to verify existing structural framing. remodel work under separate permit. | $5,000 |
| Nov 17, 2014 | Completed final sign-off Jun 2015 | 2754 Folsom St | rear building: remodel (e) kitchen includes new cabinetry, appliances and replacement/reduced size of one property window per plan. window not visible from street. no change to permit. 2754a is located at the rear of the lot.Details
rear building: remodel (e) kitchen includes new cabinetry, appliances and replacement/reduced size of one property window per plan. window not visible from street. no change to permit. 2754a is located at the rear of the lot. | $15,000 |
| Jan 17, 2014 | Completed final sign-off Mar 2014 | 3627 23rd St | widen opening between kitchen & dining, add central heating, replace fixtures in bath.Details
widen opening between kitchen & dining, add central heating, replace fixtures in bath. | $20,000 |
| Jul 15, 2013 | Completed final sign-off Dec 2013 | 1851 Church St | kitchen renovation including replacement of 2 (e) windows, 1 door & replace 1 window with sliding door; not visible from streetDetails
kitchen renovation including replacement of 2 (e) windows, 1 door & replace 1 window with sliding door; not visible from street | $30,000 |
| Aug 21, 2012 | Expired or cancelled cancelled Jan 2024 | 3771 Clay St | 4-story rear addition. new front entry stair & guardrails. replace (e) windows at front of house. remodel kitchen.Details
4-story rear addition. new front entry stair & guardrails. replace (e) windows at front of house. remodel kitchen. | $360,000 |
| Jul 17, 2012 | Completed final sign-off Feb 2013 | 521 Buena Vista West Av | renovation of 3rd floor - relocate kitchen, add gas fireplace, reduce full bath to 1/2 bath, add ma bath,replace (e) rear yard/west facing window & french door w/fixed casement unit & sliding glass door,remove (e)rear yard/west facing ext door, relocate attic access, disable 2nd flr liv rm fireplaceDetails
renovation of 3rd floor - relocate kitchen, add gas fireplace, reduce full bath to 1/2 bath, add ma bath,replace (e) rear yard/west facing window & french door w/fixed casement unit & sliding glass door,remove (e)rear yard/west facing ext door, relocate attic access, disable 2nd flr liv rm fireplace | $125,000 |
| May 1, 2012 | Completed final sign-off Jan 2014 | 26 Roanoke St | new exterior deck at rear yard & kitchen renovation including new opening at interior load - bearing wall.Details
new exterior deck at rear yard & kitchen renovation including new opening at interior load - bearing wall. | $40,000 |
| Jul 22, 2011 | Completed final sign-off Dec 2011 | 44 Arnold Av | kitchen: remove non bearing partition at kitchen/dining wall, replace cabinets, sink, and range hood, tile floor. bath: remove e stall shower, new showerhead over e tub, replace e sink and toilet, tile shower and floorDetails
kitchen: remove non bearing partition at kitchen/dining wall, replace cabinets, sink, and range hood, tile floor. bath: remove e stall shower, new showerhead over e tub, replace e sink and toilet, tile shower and floor | $25,000 |
| Jun 16, 2010 | Completed final sign-off Jan 2011 | 1907 Leavenworth St | kitchen and bath remodel, replace 4 1/2 ft of bearing wall with beam. move e subpanel, replace closet doors, resolve complaint 201038258Details
kitchen and bath remodel, replace 4 1/2 ft of bearing wall with beam. move e subpanel, replace closet doors, resolve complaint 201038258 | $45,000 |