Back to kitchen remodel contractors
Astorga Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 29 permits filed
142 permits since 2000: 93 completed, 9 in progress, 31 never finaled, 9 expired or cancelled.
Of the 31 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
40 kitchen remodel permits: 31 completed, 3 in progress, 6 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 1290 45th Av | kitchen remodel, new cabinets, counter sink and new appliances. in kindDetails
kitchen remodel, new cabinets, counter sink and new appliances. in kind | $23,000 |
| May 27, 2026 | In progress issued Sep 2026 | 1290 45th Av | remove ceiling over 2nd fl front kitchen, living and dining room to achieve 9'3" ceiling height. reinforce roof rafter framing.Details
remove ceiling over 2nd fl front kitchen, living and dining room to achieve 9'3" ceiling height. reinforce roof rafter framing. | $38,000 |
| Mar 24, 2026 | Completed final sign-off Jun 2026 | 477 Dellbrook Av | remodel kitchen in kind new cabinets and appliances (approx 120 sq ft), partial bathroom remodel, replace fixtures, new shower surround and pan, new vanity and sink, new toilet. floor to remain. tub to remain. all remodeling in kind.Details
remodel kitchen in kind new cabinets and appliances (approx 120 sq ft), partial bathroom remodel, replace fixtures, new shower surround and pan, new vanity and sink, new toilet. floor to remain. tub to remain. all remodeling in kind. | $20,000 |
| Jan 20, 2026 | Completed final sign-off Feb 2026 | 214 Santa Clara Av | front building: partial kitchen remodel in kind - replace (e) kitchen counter top and sink in kind. no change to floor layout. no change to wall layout. no structural work.Details
front building: partial kitchen remodel in kind - replace (e) kitchen counter top and sink in kind. no change to floor layout. no change to wall layout. no structural work. | $2,000 |
| Nov 21, 2025 | Completed final sign-off Mar 2026 | 1250 Ellis St | unit #2: replace kitchen countertop, (2) vanity tops in (2) bathrooms and paint apartment. like for like.Details
unit #2: replace kitchen countertop, (2) vanity tops in (2) bathrooms and paint apartment. like for like. | $5,000 |
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 735 Geary St | unit #103: remodel kitchen, replace cabinets and counter top. remodel bathroom: replace fixtures. replace tile in kitchen and bathroom. in-kind remodelDetails
unit #103: remodel kitchen, replace cabinets and counter top. remodel bathroom: replace fixtures. replace tile in kitchen and bathroom. in-kind remodel | $30,000 |
| May 19, 2025 | Completed final sign-off Sep 2025 | 1429 Leavenworth St | unit #104: kitchen remodel - replace cabinets, replace tile flooring. in kind.Details
unit #104: kitchen remodel - replace cabinets, replace tile flooring. in kind. | $30,000 |
| Mar 19, 2025 | In progress issued Mar 2025 | 1429 Leavenworth St | unit 101: kitchen and bath remodel to comply with violation 202534756Details
unit 101: kitchen and bath remodel to comply with violation 202534756 | $42,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 500 Hyde St | unit 502: remodel kitchen and bathroom.Details
unit 502: remodel kitchen and bathroom. | $42,000 |
| Nov 12, 2024 | Completed final sign-off Mar 2025 | 601 Saint Francis Bl | kitchen remodel, replace kitchen cabinets, counter tops, new sink and faucet. master bathroom remodel, redo existing shower valve, replace vanity toilet, tile. bathroom remodel replace all fixtures. no removal of wallsDetails
kitchen remodel, replace kitchen cabinets, counter tops, new sink and faucet. master bathroom remodel, redo existing shower valve, replace vanity toilet, tile. bathroom remodel replace all fixtures. no removal of walls | $49,000 |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 3856 California St | unit 1: kitchen and bathroom remodel; no removal of wallsDetails
unit 1: kitchen and bathroom remodel; no removal of walls | $48,000 |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 710 Moraga St | unit c: in-kind kitchen and bathroom remodel. paint, cabinets, fixtures, new tile in bathroom.Details
unit c: in-kind kitchen and bathroom remodel. paint, cabinets, fixtures, new tile in bathroom. | $25,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2024 | 18 Bennington St | bathroom remodel, replace fixtures, same plumbing. replace kitchen counter and sink, new stove-hood, reuse existing fixtures and appliances. replace damages rear siding around window, not visible from street.Details
bathroom remodel, replace fixtures, same plumbing. replace kitchen counter and sink, new stove-hood, reuse existing fixtures and appliances. replace damages rear siding around window, not visible from street. | $10,000 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 1206 Valencia St | unit #2: 1 kitchen and 1 bathroom remodel.Details
unit #2: 1 kitchen and 1 bathroom remodel. | $25,000 |
| Mar 21, 2024 | Completed final sign-off Feb 2025 | 1454 Church St | remodel extg kitchen and bathroom: to including nstallation of new appliances, fixtures, finishes cabinetry and associated plmg & electrical. add new bathroom including installation of new applicance, fixtures, finishes, cabinetry & assoc. plmg & elec. install new lighting & elec. at remodeled areaDetails
remodel extg kitchen and bathroom: to including nstallation of new appliances, fixtures, finishes cabinetry and associated plmg & electrical. add new bathroom including installation of new applicance, fixtures, finishes, cabinetry & assoc. plmg & elec. install new lighting & elec. at remodeled area | $50,000 |
| Nov 14, 2023 | Completed final sign-off Jan 2025 | 2946 California St | replace kitchen cabinets and countertops. replace flooring. no other work.Details
replace kitchen cabinets and countertops. replace flooring. no other work. | $10,000 |
| Aug 4, 2023 | Completed final sign-off Dec 2023 | 1692 08th Av | kitchen and diniing room remodel. remove wall between kitchen and dining.Details
kitchen and diniing room remodel. remove wall between kitchen and dining. | $60,000 |
| Feb 16, 2023 | Completed final sign-off Mar 2023 | 238 Cole St | replace kitchen cabinets, no plumbing or electrical work to be done. patch and paint all unit. replace bathroom fixtures.Details
replace kitchen cabinets, no plumbing or electrical work to be done. patch and paint all unit. replace bathroom fixtures. | $9,000 |
| Oct 17, 2022 | Never finaled issued Oct 2022, no final | 1512 Shrader St | kitchen remodel - replace with same in kind cabinets. replace kitchen sink in kind. no structural work to be done and no floor layout changes.Details
kitchen remodel - replace with same in kind cabinets. replace kitchen sink in kind. no structural work to be done and no floor layout changes. | $8,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 1241 Taylor St | remodel kitchen and bathroom. no wall modification no structural wkDetails
remodel kitchen and bathroom. no wall modification no structural wk | $10,000 |
| Apr 29, 2022 | Completed final sign-off Dec 2022 | 5392 Mission St | to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener.Details
to comply with complaint# 202286559. legalization of unauthorized (n) commercial kitchen hood & cooler. create new vent opening on ottowa ave wall, painted. adding ada automatic door opener. | $15,000 |
| Apr 8, 2022 | Completed final sign-off May 2022 | 553 Frederick St | unit #202: to comply w/ complaint 202288820: replace bathroom fxtures and replace kitchen sinkDetails
unit #202: to comply w/ complaint 202288820: replace bathroom fxtures and replace kitchen sink | $2,000 |
| Jul 30, 2021 | Completed final sign-off Aug 2021 | 65 Delano Av | kitchen and bath remodel first level. replace kithcen cabinets, replace bath fixtures.Details
kitchen and bath remodel first level. replace kithcen cabinets, replace bath fixtures. | $5,000 |
| Jul 2, 2021 | Completed final sign-off May 2022 | 2721 20th St | work to conform to his complaints 202177781, 202178672, 202178673, 202178674, kitchen cabinets, window as specified, stairs (rear), kitchen floor tiles or linoleum. windows not facing street.Details
work to conform to his complaints 202177781, 202178672, 202178673, 202178674, kitchen cabinets, window as specified, stairs (rear), kitchen floor tiles or linoleum. windows not facing street. | $30,000 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 696 05th Av | revision to app#202002285677. 1st floor convert dining to bedroom. remodel kitchen. install new recessed lights to both units. add ceiling. fans and skylight at unit 2Details
revision to app#202002285677. 1st floor convert dining to bedroom. remodel kitchen. install new recessed lights to both units. add ceiling. fans and skylight at unit 2 | $40,000 |
| Feb 28, 2020 | Completed final sign-off May 2021 | 696 05th Av | 1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg toDetails
1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg to | $50,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2020 | 22 Terra Vista Av | unit d8: kitchen and bathroom remodel. replace kitchen cabinets & fixtures. bathroom new fixtures. in kindDetails
unit d8: kitchen and bathroom remodel. replace kitchen cabinets & fixtures. bathroom new fixtures. in kind | $35,000 |
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 77 Grand View Av | replace kitchen cabinets w/countertops. replace bathroom fixtures and kitchen & bathroom remodel. no wall/framing modification no strtuctural workDetails
replace kitchen cabinets w/countertops. replace bathroom fixtures and kitchen & bathroom remodel. no wall/framing modification no strtuctural work | $10,000 |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 1344 Thomas Av | kitchen (8'x8') & bathroom (5'x6') remodelDetails
kitchen (8'x8') & bathroom (5'x6') remodel | $20,000 |
| May 24, 2019 | Completed final sign-off Aug 2019 | 601 Van Ness Av | replace kitchen cabinets and counter tops n/a maherDetails
replace kitchen cabinets and counter tops n/a maher | $8,000 |
| May 8, 2019 | Completed final sign-off Jun 2019 | 365 Clipper St | replace kitchen counter top and floor tile only.Details
replace kitchen counter top and floor tile only. | $4,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2019 | 1620 Broadway | remodel kitchen & bathroom unit 5 only. 9x6 sq ft kitchen, 5x8 sq ftDetails
remodel kitchen & bathroom unit 5 only. 9x6 sq ft kitchen, 5x8 sq ft | $9,000 |
| Nov 8, 2018 | Completed final sign-off Jul 2019 | 235 Berry St | unit 609: replace kitchen cabinets same in kind and counter top 130 sq ft.Details
unit 609: replace kitchen cabinets same in kind and counter top 130 sq ft. | $10,000 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 1620 Broadway | to comply w/ complaint#201888071. remodel bathrooms & kitchens & add laundry hook ups. 3 kitchens & 3 baths. unit#2,4,6Details
to comply w/ complaint#201888071. remodel bathrooms & kitchens & add laundry hook ups. 3 kitchens & 3 baths. unit#2,4,6 | $85,000 |
| Jun 5, 2018 | Completed final sign-off Jul 2018 | 637 South Van Ness Av | g/f: remove kitchen hood. kitchen being removed. no cooking facilty req.Details
g/f: remove kitchen hood. kitchen being removed. no cooking facilty req. | $600 |
| Aug 28, 2017 | Never finaled issued Oct 2017, no final | 338 27th St | minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet.Details
minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet. | $53,000 |
| May 31, 2017 | Completed final sign-off Oct 2017 | 74 Piedmont St | replace existing kitchen cabinets, new counter top update electrical w new sub panel and necessary circuits, update existing plumbin. no walls to be alteredDetails
replace existing kitchen cabinets, new counter top update electrical w new sub panel and necessary circuits, update existing plumbin. no walls to be altered | $12,000 |
| Dec 27, 2016 | Never finaled issued Dec 2016, no final | 949 Ashbury St | unit 738. remodel small kitchen and bathroom.Details
unit 738. remodel small kitchen and bathroom. | $3,000 |
| May 25, 2016 | Never finaled filed May 2016, never issued | 1250 Silver Av | to comply with nov 201692991: remove (e) kitchen facilities. return storage to stroage conditions capp plumbing to source. the facility is in a commercial store. ord 33-16Details
to comply with nov 201692991: remove (e) kitchen facilities. return storage to stroage conditions capp plumbing to source. the facility is in a commercial store. ord 33-16 | $400 |
| Oct 28, 2015 | Completed final sign-off Apr 2016 | 3346 Mission St | work limited to top (2nd) residential unit -consists (in kind) non-structural repair/replace interior finishes includes 1 1/2 new toilets, work includes (n) plumbing & elec. fixtures: no mechanical. interior finishes for kitchen and plumbing; replace all windows in unit except those street facing.Details
work limited to top (2nd) residential unit -consists (in kind) non-structural repair/replace interior finishes includes 1 1/2 new toilets, work includes (n) plumbing & elec. fixtures: no mechanical. interior finishes for kitchen and plumbing; replace all windows in unit except those street facing. | $35,000 |