Back to bathroom remodel contractors
Astorga Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 29 permits filed
142 permits since 2000: 93 completed, 9 in progress, 31 never finaled, 9 expired or cancelled.
Of the 31 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 5 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 32 completed, 3 in progress, 5 never finaled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 655 Jackson St | replace bathroom fixtures and replace tile per complaint 202663455.Details
replace bathroom fixtures and replace tile per complaint 202663455. | $5,000 |
| Mar 24, 2026 | Completed final sign-off Jun 2026 | 477 Dellbrook Av | remodel kitchen in kind new cabinets and appliances (approx 120 sq ft), partial bathroom remodel, replace fixtures, new shower surround and pan, new vanity and sink, new toilet. floor to remain. tub to remain. all remodeling in kind.Details
remodel kitchen in kind new cabinets and appliances (approx 120 sq ft), partial bathroom remodel, replace fixtures, new shower surround and pan, new vanity and sink, new toilet. floor to remain. tub to remain. all remodeling in kind. | $20,000 |
| Feb 9, 2026 | Completed final sign-off Jul 2026 | 4075 20th St | 1)remove e bearing wall between kicthen and dining room. 2)relocate e laundry room to 3rd floor. 3)infill e floor opening at 3rd floor. 4)renovate e bathroom at 3rd floor.Details
1)remove e bearing wall between kicthen and dining room. 2)relocate e laundry room to 3rd floor. 3)infill e floor opening at 3rd floor. 4)renovate e bathroom at 3rd floor. | $100,000 |
| Nov 21, 2025 | Completed final sign-off Mar 2026 | 1250 Ellis St | unit #2: replace kitchen countertop, (2) vanity tops in (2) bathrooms and paint apartment. like for like.Details
unit #2: replace kitchen countertop, (2) vanity tops in (2) bathrooms and paint apartment. like for like. | $5,000 |
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 735 Geary St | unit #103: remodel kitchen, replace cabinets and counter top. remodel bathroom: replace fixtures. replace tile in kitchen and bathroom. in-kind remodelDetails
unit #103: remodel kitchen, replace cabinets and counter top. remodel bathroom: replace fixtures. replace tile in kitchen and bathroom. in-kind remodel | $30,000 |
| Mar 19, 2025 | In progress issued Mar 2025 | 1429 Leavenworth St | unit 101: kitchen and bath remodel to comply with violation 202534756Details
unit 101: kitchen and bath remodel to comply with violation 202534756 | $42,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 500 Hyde St | unit 502: remodel kitchen and bathroom.Details
unit 502: remodel kitchen and bathroom. | $42,000 |
| Feb 18, 2025 | Completed final sign-off Aug 2025 | 2084 Mission St | renovate 7 bathrooms: install floor drains, new valves and new tile. bathroom in common area. like for like remodeling.Details
renovate 7 bathrooms: install floor drains, new valves and new tile. bathroom in common area. like for like remodeling. | $50,000 |
| Jan 14, 2025 | Completed final sign-off Mar 2025 | 601 Saint Francis Bl | rev to pa# 2024-1112-4803; remove and replace window in shower/bathroom 2nd level, non street facingDetails
rev to pa# 2024-1112-4803; remove and replace window in shower/bathroom 2nd level, non street facing | $600 |
| Nov 12, 2024 | Completed final sign-off Mar 2025 | 601 Saint Francis Bl | kitchen remodel, replace kitchen cabinets, counter tops, new sink and faucet. master bathroom remodel, redo existing shower valve, replace vanity toilet, tile. bathroom remodel replace all fixtures. no removal of wallsDetails
kitchen remodel, replace kitchen cabinets, counter tops, new sink and faucet. master bathroom remodel, redo existing shower valve, replace vanity toilet, tile. bathroom remodel replace all fixtures. no removal of walls | $49,000 |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 3856 California St | unit 1: kitchen and bathroom remodel; no removal of wallsDetails
unit 1: kitchen and bathroom remodel; no removal of walls | $48,000 |
| Sep 20, 2024 | Completed final sign-off Dec 2024 | 710 Moraga St | unit c: in-kind kitchen and bathroom remodel. paint, cabinets, fixtures, new tile in bathroom.Details
unit c: in-kind kitchen and bathroom remodel. paint, cabinets, fixtures, new tile in bathroom. | $25,000 |
| Sep 19, 2024 | In progress issued Sep 2024 | 2084 Mission St | common area. renovation of 2 (two bathrooms. new drain for shower, no tub. add floor drain in bathroom floor. new shower valve, shut off valve for toilet no sink. tile and stoen panels in the shower. replace light fixture, fan and switch. sheet rock as needed and paint. like for likeDetails
common area. renovation of 2 (two bathrooms. new drain for shower, no tub. add floor drain in bathroom floor. new shower valve, shut off valve for toilet no sink. tile and stoen panels in the shower. replace light fixture, fan and switch. sheet rock as needed and paint. like for like | $15,000 |
| Aug 27, 2024 | Completed final sign-off Dec 2024 | 18 Bennington St | bathroom remodel, replace fixtures, same plumbing. replace kitchen counter and sink, new stove-hood, reuse existing fixtures and appliances. replace damages rear siding around window, not visible from street.Details
bathroom remodel, replace fixtures, same plumbing. replace kitchen counter and sink, new stove-hood, reuse existing fixtures and appliances. replace damages rear siding around window, not visible from street. | $10,000 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 1206 Valencia St | unit #2: 1 kitchen and 1 bathroom remodel.Details
unit #2: 1 kitchen and 1 bathroom remodel. | $25,000 |
| Mar 21, 2024 | Completed final sign-off Feb 2025 | 1454 Church St | remodel extg kitchen and bathroom: to including nstallation of new appliances, fixtures, finishes cabinetry and associated plmg & electrical. add new bathroom including installation of new applicance, fixtures, finishes, cabinetry & assoc. plmg & elec. install new lighting & elec. at remodeled areaDetails
remodel extg kitchen and bathroom: to including nstallation of new appliances, fixtures, finishes cabinetry and associated plmg & electrical. add new bathroom including installation of new applicance, fixtures, finishes, cabinetry & assoc. plmg & elec. install new lighting & elec. at remodeled area | $50,000 |
| Feb 22, 2024 | Completed final sign-off Oct 2024 | 100 Rae Av | demo bedroom closet and provide bathroom, provide closet to north walls of bedroom.Details
demo bedroom closet and provide bathroom, provide closet to north walls of bedroom. | $8,000 |
| Feb 1, 2024 | Completed final sign-off Feb 2024 | 378 Crescent Av | bathroom upgrade replace toilet, tub and sink. new tile around tub and floor no change to layout. comply with nov# 201974142. remove deck and sunroom.Details
bathroom upgrade replace toilet, tub and sink. new tile around tub and floor no change to layout. comply with nov# 201974142. remove deck and sunroom. | $10,000 |
| Jan 5, 2024 | Completed final sign-off Jan 2025 | 2946 California St | remodel one guest bathroom - same layout.Details
remodel one guest bathroom - same layout. | $8,000 |
| Oct 30, 2023 | Completed final sign-off Apr 2025 | 2946 California St | remodel (e) bathroom, shower & (e) standing tub, replace (e) vanity, new plumbing/electrical for laundry room in (e) closet.Details
remodel (e) bathroom, shower & (e) standing tub, replace (e) vanity, new plumbing/electrical for laundry room in (e) closet. | $15,000 |
| Feb 16, 2023 | Completed final sign-off Mar 2023 | 238 Cole St | replace kitchen cabinets, no plumbing or electrical work to be done. patch and paint all unit. replace bathroom fixtures.Details
replace kitchen cabinets, no plumbing or electrical work to be done. patch and paint all unit. replace bathroom fixtures. | $9,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 1241 Taylor St | remodel kitchen and bathroom. no wall modification no structural wkDetails
remodel kitchen and bathroom. no wall modification no structural wk | $10,000 |
| Apr 8, 2022 | Completed final sign-off May 2022 | 553 Frederick St | unit #202: to comply w/ complaint 202288820: replace bathroom fxtures and replace kitchen sinkDetails
unit #202: to comply w/ complaint 202288820: replace bathroom fxtures and replace kitchen sink | $2,000 |
| Dec 17, 2021 | Completed final sign-off Aug 2022 | 130 Margaret Av | legalize 294 sf of extg unconditional space at lower level of extg one story residence and convert into new conditioned private office and legal bathroom. no change to extg foot print.Details
legalize 294 sf of extg unconditional space at lower level of extg one story residence and convert into new conditioned private office and legal bathroom. no change to extg foot print. | $15,000 |
| Sep 7, 2021 | Completed final sign-off Dec 2021 | 3121 16th St | paint, replace countertop and replace floor tile for 2 bathrooms.Details
paint, replace countertop and replace floor tile for 2 bathrooms. | $15,000 |
| Jul 30, 2021 | Completed final sign-off Aug 2021 | 65 Delano Av | kitchen and bath remodel first level. replace kithcen cabinets, replace bath fixtures.Details
kitchen and bath remodel first level. replace kithcen cabinets, replace bath fixtures. | $5,000 |
| Feb 28, 2020 | Completed final sign-off May 2021 | 696 05th Av | 1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg toDetails
1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg to | $50,000 |
| Oct 31, 2019 | Completed final sign-off Mar 2020 | 1151 South Van Ness Av | apts 1151a and 1153 south van ness ave: to comply with nov 201987181 convert laundry rm to full bath on 1st and 2nd fl.Details
apts 1151a and 1153 south van ness ave: to comply with nov 201987181 convert laundry rm to full bath on 1st and 2nd fl. | $8,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2020 | 22 Terra Vista Av | unit d8: kitchen and bathroom remodel. replace kitchen cabinets & fixtures. bathroom new fixtures. in kindDetails
unit d8: kitchen and bathroom remodel. replace kitchen cabinets & fixtures. bathroom new fixtures. in kind | $35,000 |
| Sep 11, 2019 | Completed final sign-off Nov 2019 | 77 Grand View Av | replace kitchen cabinets w/countertops. replace bathroom fixtures and kitchen & bathroom remodel. no wall/framing modification no strtuctural workDetails
replace kitchen cabinets w/countertops. replace bathroom fixtures and kitchen & bathroom remodel. no wall/framing modification no strtuctural work | $10,000 |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 1344 Thomas Av | kitchen (8'x8') & bathroom (5'x6') remodelDetails
kitchen (8'x8') & bathroom (5'x6') remodel | $20,000 |
| Mar 28, 2019 | Completed final sign-off Dec 2019 | 1620 Broadway | remodel kitchen & bathroom unit 5 only. 9x6 sq ft kitchen, 5x8 sq ftDetails
remodel kitchen & bathroom unit 5 only. 9x6 sq ft kitchen, 5x8 sq ft | $9,000 |
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 1620 Broadway | change closet into 1/2 bathroom in unit #4 & unit #6. no structural.Details
change closet into 1/2 bathroom in unit #4 & unit #6. no structural. | $8,000 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 1620 Broadway | to comply w/ complaint#201888071. remodel bathrooms & kitchens & add laundry hook ups. 3 kitchens & 3 baths. unit#2,4,6Details
to comply w/ complaint#201888071. remodel bathrooms & kitchens & add laundry hook ups. 3 kitchens & 3 baths. unit#2,4,6 | $85,000 |
| Oct 26, 2017 | Completed final sign-off Dec 2017 | 550 15th St | to update 1st floor bathroom to a ada bathroom to service extg coffee shop. new elelctrical and plumbing. n/a for maherDetails
to update 1st floor bathroom to a ada bathroom to service extg coffee shop. new elelctrical and plumbing. n/a for maher | $8,000 |
| Aug 28, 2017 | Never finaled issued Oct 2017, no final | 338 27th St | minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet.Details
minor renovations to lower unit #338: remodel (e) bath & expand bedroom closet. renovate unit #40 kitchen, add powder rm, open wall between kitchen & dining room by adding steel beam and associated posts. renovate top floor bath. add (n) bath, (n) washer/dryer closet. | $53,000 |
| Jun 12, 2017 | Never finaled issued Jun 2017, no final | 1142 Prague St | legalize bathroom in social room per 201703222012 per inspector requestDetails
legalize bathroom in social room per 201703222012 per inspector request | $2,500 |
| Dec 27, 2016 | Never finaled issued Dec 2016, no final | 949 Ashbury St | unit 738. remodel small kitchen and bathroom.Details
unit 738. remodel small kitchen and bathroom. | $3,000 |
| Mar 25, 2016 | Completed final sign-off Jul 2016 | 366 Thornton Av | revision to p.a. # 2015-0611-8746. correction to bathroom layout to legalize (e) shower on ground floor.Details
revision to p.a. # 2015-0611-8746. correction to bathroom layout to legalize (e) shower on ground floor. | $1,000 |
| Jun 11, 2015 | Completed final sign-off Jul 2016 | 366 Thornton Av | legazlize lower floor bathroom and bedroom per plan.Details
legazlize lower floor bathroom and bedroom per plan. | $20,000 |