Artcraft Construction
- Based in
- Emeryville
- On San Francisco permits
- Jun 2004 to Dec 2024
- Last 24 months
- 1 permit filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 33 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2024 | Completed final sign-off May 2025 | 122 Highland Av | (front bldg) to comply with nov 202423517. revision to permit 202408279562. (1) revised guardrail height at open sides of stairs. (2) removal of posts closest to bldg. (3) correction of (e) and (p) drawing to show (e) over hang at floor 3 landing to be replaced.Details
(front bldg) to comply with nov 202423517. revision to permit 202408279562. (1) revised guardrail height at open sides of stairs. (2) removal of posts closest to bldg. (3) correction of (e) and (p) drawing to show (e) over hang at floor 3 landing to be replaced. | |
| Aug 27, 2024 | Completed final sign-off May 2025 | 122 Highland Av | revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517Details
revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517 | $10,000 |