Back to bathroom remodel contractors
Artcraft Construction
- Based in
- Emeryville
- On San Francisco permits
- Jun 2004 to Dec 2024
- Last 24 months
- 1 permit filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 1 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2017 | Completed final sign-off Feb 2018 | 336 Banks St | convert (e) 1/f storage rooms & portion of garage into (n) family room & bathroom, adding 634 sq.ft. of newly conditioned space.Details
convert (e) 1/f storage rooms & portion of garage into (n) family room & bathroom, adding 634 sq.ft. of newly conditioned space. | $60,000 |
| Oct 20, 2016 | Completed final sign-off May 2019 | 92 Sotelo Av | enclose (e) second floor roof deck for new master bedroom & bath. create new bedroom & bath in (e) unconditioned storage space in basement.Details
enclose (e) second floor roof deck for new master bedroom & bath. create new bedroom & bath in (e) unconditioned storage space in basement. | $200,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2016 | 2642 31st Av | demolish existing 1st fl office and portiton of 1st fl slab. new master bedroom, mastr bath, foyer and laundryDetails
demolish existing 1st fl office and portiton of 1st fl slab. new master bedroom, mastr bath, foyer and laundry | $40,000 |
| Mar 28, 2012 | Never finaled issued Mar 2012, no final | 1122 Pine St | construct new deck, remove 1 existing door and 2 existing windows and replace with 3 new doors. remodel 2 baths. put vanity in popout into lightwell. (kitchen work on separate permit)Details
construct new deck, remove 1 existing door and 2 existing windows and replace with 3 new doors. remodel 2 baths. put vanity in popout into lightwell. (kitchen work on separate permit) | $20,000 |
| Oct 22, 2010 | Completed final sign-off Apr 2011 | 1640 Broderick St | demolition 2 bathrooms fixtures and finishes, 1 kitchen fixtures and finishes, 2 vanities in bedrooms, and non-structural partitions.minor alteration to structural/load bearning walls.Details
demolition 2 bathrooms fixtures and finishes, 1 kitchen fixtures and finishes, 2 vanities in bedrooms, and non-structural partitions.minor alteration to structural/load bearning walls. | $70,000 |
| Jun 7, 2010 | Completed final sign-off Jul 2010 | 721 Holloway Av | remodel bathroom,move doorDetails
remodel bathroom,move door | $9,000 |
| Sep 18, 2007 | Completed final sign-off Mar 2008 | 253 Mangels Av | remove window and install new double door at rear; build 10x10 deck; install new kitchen cabinets and countertops; install new plumbing and electrical fixtures in kitchen; install new plumbing fixtures & tile in bathroom; install recessed lights in living room.Details
remove window and install new double door at rear; build 10x10 deck; install new kitchen cabinets and countertops; install new plumbing and electrical fixtures in kitchen; install new plumbing fixtures & tile in bathroom; install recessed lights in living room. | $20,000 |