Back to kitchen remodel contractors
Arrow Builders Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 9 permits filed
55 permits since 2000: 41 completed, 3 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 11 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 27 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 3878 Clay St | (n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights.Details
(n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights. | $200,000 |
| Oct 17, 2025 | In progress issued Dec 2025 | 225 Locust St | interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr.Details
interior remodel including new mud room at basement, remodel (e) kitchen and pantry on 1st flr, remodel (e) primary suite and new laundry at 2nd flr, new dubwaiter connecting basement, 1st, and 2nd flrs, modified window opening at rear of (e) 2nd flr. | $500,000 |
| Jul 9, 2025 | Completed final sign-off Jun 2026 | 2115 Broderick St | work include replacement in kind of exterior cladding patio doors and windows at the rear yard facade on both stories. work consists of replacement in kind of kitchen casework, appliances, and plumbing fixtures. electrical systems and light fixtures will be replaced in the kitchen, dining area andDetails
work include replacement in kind of exterior cladding patio doors and windows at the rear yard facade on both stories. work consists of replacement in kind of kitchen casework, appliances, and plumbing fixtures. electrical systems and light fixtures will be replaced in the kitchen, dining area and | $100,000 |
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2512 Pacific Av | remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbingDetails
remodel single family dwelling, first flr: demo e storage, new finishes, elec,water heater w heat pumps, 2nd flr: new window openings in north wall, demo e kitchen, new kitchen in new location,finishes replacement, new elec/plumbing | $75,000 |
| Jan 23, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroomDetails
the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroom | $225,000 |
| Jun 30, 2023 | Completed final sign-off May 2024 | 7 Russian Hill Pl | remove replace flooring, plumging fixtures, kitchen counters in kind, decorative lighting, paint interiors onlyDetails
remove replace flooring, plumging fixtures, kitchen counters in kind, decorative lighting, paint interiors only | $100,000 |
| Feb 10, 2023 | Completed final sign-off Sep 2023 | 30 Walnut St | revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall.Details
revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall. | $10,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 30 Walnut St | 2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair.Details
2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair. | $50,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1717 Baker St | (n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front.Details
(n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front. | $213,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 1177 California St | unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only.Details
unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only. | $46,000 |
| Nov 26, 2019 | Completed final sign-off Oct 2022 | 2117 Broderick St | interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doorsDetails
interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doors | $285,000 |
| May 21, 2019 | Completed final sign-off Mar 2020 | 3577 Pacific Av | kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolitionDetails
kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolition | $50,000 |
| Feb 20, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | kitchen remodel and removal of existing fireplaceDetails
kitchen remodel and removal of existing fireplace | $88,403 |
| Feb 13, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck.Details
main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck. | $275,000 |
| May 25, 2017 | Completed final sign-off Oct 2017 | 2064 Jackson St | interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work.Details
interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work. | $130,000 |