Arrow Builders Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2017 to Jun 2026
- Last 24 months
- 9 permits filed
55 permits since 2000: 41 completed, 3 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 22 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 3878 Clay St | (n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights.Details
(n) fixtures and fittings, appliances, finishes at (e) locations at kitchen & 2 bathrooms, non struct partions & steam shower, change to shower at guest bath (n) pocket doors added to (e) openning (n) sconic lightng and (n) outlets, reconfigure of outlet heights. | $200,000 |
| Apr 24, 2025 | Completed final sign-off Mar 2026 | 2715 Steiner St | interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be woodDetails
interior remodel at 3 bathrooms, 1 new bathroom. replace 5 windows in kind and in place. all public facing windows to be wood | $44,357 |
| Jan 24, 2025 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylightsDetails
revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylights | $1,800 |
| Jan 23, 2024 | Completed final sign-off Sep 2024 | 1579 Funston Av | the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroomDetails
the project is a renovation of an extg kitchen and 2nd floor bathroom. the work includes new metal windows and doors on the 1st floor rear facade, and replacement of the basement potting shed exterior door. kitchen remodel including new elect. appliances, casework, and finishes. a bathroom | $225,000 |
| Aug 31, 2023 | Completed final sign-off May 2024 | 7 Russian Hill Pl | replace bathroom finishes and fixtures in kind remove and replace gas furnace and gas tankless hot water heater in same location. remove fireplace no change to chimney or chimney enclosure all interior update electric outlets to be grounded.Details
replace bathroom finishes and fixtures in kind remove and replace gas furnace and gas tankless hot water heater in same location. remove fireplace no change to chimney or chimney enclosure all interior update electric outlets to be grounded. | $25,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 30 Walnut St | 2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair.Details
2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair. | $50,000 |
| Jan 20, 2022 | Completed final sign-off Oct 2022 | 2117 Broderick St | rev to pa201911268280: refinish of basement storage area following structural improvements, includig new convenience electrical, lighting and full replace of in-kind of (e) bathroom.Details
rev to pa201911268280: refinish of basement storage area following structural improvements, includig new convenience electrical, lighting and full replace of in-kind of (e) bathroom. | $20,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1717 Baker St | (n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front.Details
(n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front. | $213,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 1177 California St | unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only.Details
unit 715: kitchen & bathroom remodel: addition of washer/dryer. remodel of (e) bedroom. interior & non-structural work only. | $46,000 |
| Sep 12, 2020 | Completed final sign-off Feb 2021 | 1711 Baker St | revision to pa #2019-0213-2849: reframe/resheath 1st floor above tradesman's path & breakfast room. reframe/resheath 2nd floor low roof above tradesman's path & floor at master bath. reframe/resheath roof above master bath & perimeter walls at master bath.Details
revision to pa #2019-0213-2849: reframe/resheath 1st floor above tradesman's path & breakfast room. reframe/resheath 2nd floor low roof above tradesman's path & floor at master bath. reframe/resheath roof above master bath & perimeter walls at master bath. | $275,000 |
| Nov 26, 2019 | Completed final sign-off Oct 2022 | 2117 Broderick St | interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doorsDetails
interior remodel of (e) kitchen, bathrooms master bedroom, facade alteration of side & rear facades (not visible from the street) to add new windows & doors | $285,000 |
| Sep 6, 2019 | Expired or cancelled expired Jun 2023 | 2715 Steiner St | revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall.Details
revision to pa# 201902203324 & 201906183738. including bathroom remodel and replacement of existing foundation and shear wall. | $20,000 |
| May 21, 2019 | Completed final sign-off Mar 2020 | 3577 Pacific Av | kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolitionDetails
kitchen: partial remodel work to include nw plmg, lgtg, finish, & cabinetry, refinishing. main level bath: remodel extg bath. add 1 powder room. work to include demolition & nw construction. nw plmg, lgtg, finishes & millwork & cabinetry. master bath: remodel extg bath work to include demolition | $50,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2021 | 1711 Baker St | main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck.Details
main floor: remodel kitchen, breakfast, powder, laundry, office . upper level: remodel master bath and kids bath. other: replace footing at tradesman's path at south property line and replace deck and stair same size as extg deck. | $275,000 |
| Aug 14, 2017 | Completed final sign-off Feb 2019 | 1913 Sacramento St | the project scope is the remodel of an extg 2 story building. total of 3 bedrooms and 2 1/2 baths.Details
the project scope is the remodel of an extg 2 story building. total of 3 bedrooms and 2 1/2 baths. | $421,000 |
| May 25, 2017 | Completed final sign-off Oct 2017 | 2064 Jackson St | interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work.Details
interior remodel of an existing bathroom, pantry & kitchen on the 3rd floor. there is no exterior work. | $130,000 |