Armour Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2012 to Jul 2026
- Last 24 months
- 9 permits filed
37 permits since 2000: 29 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 2 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2025 | Completed final sign-off Aug 2026 | 423 33rd Av | unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights.Details
unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights. | $175,000 |
| Jul 12, 2024 | Completed final sign-off Oct 2024 | 4179 26th St | remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets onlyDetails
remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets only | $40,000 |
| Oct 14, 2020 | Completed final sign-off Dec 2020 | 123 Laurel St | remove wall between kitchen & study on 2nd floor. provide beam to support joists above.Details
remove wall between kitchen & study on 2nd floor. provide beam to support joists above. | $70,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 123 Laurel St | demo (e) kitchen cabinets, add (n) lighting cabinets & appliancesDetails
demo (e) kitchen cabinets, add (n) lighting cabinets & appliances | $90,000 |
| Oct 9, 2018 | Completed final sign-off Sep 2020 | 873 Union St | interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as neededDetails
interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as needed | $288,000 |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floorDetails
wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floor | $28,000 |
| Mar 7, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | remodel (3) kitchens and (3) baths. non structural.Details
remodel (3) kitchens and (3) baths. non structural. | $200,000 |
| Dec 3, 2012 | Completed final sign-off May 2013 | 3878 Jackson St | remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures.Details
remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures. | $55,000 |