Armour Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2012 to Jul 2026
- Last 24 months
- 9 permits filed
37 permits since 2000: 29 completed, 2 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 never finaled. Typically 2 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Jul 2026 | 171 23rd Av | revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr.Details
revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr. | $25,000 |
| Feb 12, 2025 | Completed final sign-off Aug 2026 | 423 33rd Av | unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights.Details
unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights. | $175,000 |
| Jul 12, 2024 | Completed final sign-off Oct 2024 | 4179 26th St | remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets onlyDetails
remodel down stairs bathroom install new appliances in kitchen replace 6 base cabinets only | $40,000 |
| Oct 9, 2018 | Completed final sign-off Sep 2020 | 873 Union St | interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as neededDetails
interior remodel of 3 units to include: 1 new bathroom per unit, remodel kitchens, 3 remodel bathrooms. 3 new elect & plumb as needed | $288,000 |
| Aug 9, 2018 | Completed final sign-off Nov 2018 | 4417 20th St | add a new bathroom & gym/storage room in (e) garage.Details
add a new bathroom & gym/storage room in (e) garage. | $40,000 |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floorDetails
wall removal at each floor (260 and 264 downey) between family and dining room. replace with new structural beam. reconfiguration of existing bathrooms and kitchen on each floor. infill window in lightwell at each floor | $28,000 |
| Mar 7, 2017 | Completed final sign-off Aug 2017 | 260 Downey St | remodel (3) kitchens and (3) baths. non structural.Details
remodel (3) kitchens and (3) baths. non structural. | $200,000 |
| Nov 17, 2015 | Never finaled issued Dec 2015, no final | 2909 Folsom St | new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area.Details
new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area. | $75,000 |
| Dec 3, 2012 | Completed final sign-off May 2013 | 3878 Jackson St | remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures.Details
remodel kitchen and 3.5 bathrooms. new cabinets, tile and fixtures. | $55,000 |