Back to kitchen remodel contractors
Argo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Aug 2026
- Last 24 months
- 3 permits filed
42 permits since 2000: 34 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 405 Filbert St | kitchen and interior finishes remodeling, no structural work, no change of wall, window and doorDetails
kitchen and interior finishes remodeling, no structural work, no change of wall, window and door | $15,000 |
| Jan 17, 2013 | Completed final sign-off Feb 2014 | 470 38th Av | renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr.Details
renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr. | $95,000 |
| Aug 8, 2012 | Completed final sign-off Jan 2013 | 1782 21st Av | kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile.Details
kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile. | $25,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 1469 Kearny St | removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of propertyDetails
removal of (e) interior wall & addition of new wood beam & columns. new kitchen & closet cabinets. 2 new windows facing back of property, 1 in an (e) opening to be widened. replacement of (e) door facing back of property | $18,000 |
| Nov 23, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586Details
drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586 | $3,000 |
| Oct 6, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor.Details
second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor. | $45,000 |
| Apr 1, 2008 | Completed final sign-off Nov 2008 | 1243 38th Av | kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet.Details
kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet. | $30,000 |
| Jan 28, 2008 | Completed final sign-off Aug 2008 | 380 Byxbee St | revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet.Details
revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet. | |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 1494 27th Av | 1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced.Details
1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced. | $17,000 |
| Mar 30, 2006 | Completed final sign-off Jun 2007 | 461 02nd St | kitchen remodel- non structural work. at least 50% of the total kitchen lighting waltage must be of fluorescent lights.Details
kitchen remodel- non structural work. at least 50% of the total kitchen lighting waltage must be of fluorescent lights. | $10,000 |
| Oct 14, 2005 | Completed final sign-off Nov 2007 | 9 De Soto St | remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/fDetails
remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/f | $60,000 |