Back to bathroom remodel contractors
Argo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Aug 2026
- Last 24 months
- 3 permits filed
42 permits since 2000: 34 completed, 1 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 0 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2017 | Completed final sign-off Dec 2021 | 1782 21st Av | interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower flooDetails
interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower floo | $125,000 |
| May 9, 2014 | Completed final sign-off Aug 2014 | 490 34th Av | to comply with nov# 201460231. complaint # 201460231. light to have motion sensor, two bathrooms, interior finishes & remodeling. work only for unit #103 under this permit. no changes to door or windows. replace fan with convert to ducts.Details
to comply with nov# 201460231. complaint # 201460231. light to have motion sensor, two bathrooms, interior finishes & remodeling. work only for unit #103 under this permit. no changes to door or windows. replace fan with convert to ducts. | $8,000 |
| Oct 15, 2013 | Completed final sign-off Dec 2013 | 405 Filbert St | bathroom remodeling-no structural workDetails
bathroom remodeling-no structural work | $9,000 |
| Jan 17, 2013 | Completed final sign-off Feb 2014 | 470 38th Av | renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr.Details
renovated mudroom,office @ 1st flr. modernize ktichen & bathrooms, remove partitions & structl walls & replace/relocated to accommodate the new plan. replace all kitchen cabinets & appliances, replace all alum retrofit windows (not orig) with wood windows. remodel (e) baths & add new bath @ 3rd flr. | $95,000 |
| Jan 8, 2013 | Completed final sign-off Mar 2013 | 25 Lucerne St | replace extg flooring in kind, replace extg lighting in kind, replace half bath fixtures in kind, remodel ground floor work area, remodel main bathroom, no structural work.Details
replace extg flooring in kind, replace extg lighting in kind, replace half bath fixtures in kind, remodel ground floor work area, remodel main bathroom, no structural work. | $19,500 |
| Aug 8, 2012 | Completed final sign-off Jan 2013 | 1782 21st Av | kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile.Details
kitchen and bathroom remodeling. kitchen cabinets, light fixtures, flooring, appliances, (n) drywall, shower pan. tile. | $25,000 |
| Nov 23, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586Details
drywall replacement in entire house. refrane upper bedrooms closets and bathroom, lower kitchen wall. install soffits to cover all pipes in garage. per inspection request notice of violation # 201079586 | $3,000 |
| Oct 6, 2010 | Completed final sign-off Apr 2011 | 260 Topaz Wy | second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor.Details
second floor: kitchen & 1/2 bathroom remodeling. third floor: 2-each bathrooms remodeling. no moving or adding walls. kitchen: at least 50% high efficency (h.e.) by wattage- lighting. bathroom: he or occupancy sensor. | $45,000 |
| Sep 25, 2008 | Completed final sign-off Mar 2010 | 1243 38th Av | ground floor remodel: add family room, bedroom, full bath, and sunroom under existing sunroom at 2nd floor. new rear door.Details
ground floor remodel: add family room, bedroom, full bath, and sunroom under existing sunroom at 2nd floor. new rear door. | $30,000 |
| Apr 1, 2008 | Completed final sign-off Nov 2008 | 1243 38th Av | kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet.Details
kitchen & bathroom remodeling, add new master bathroom, convert restroom on main level into closet. | $30,000 |
| Jan 28, 2008 | Completed final sign-off Aug 2008 | 380 Byxbee St | revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet.Details
revision to appl #200702234756-s: remove skylight in existing dining area; remove new window in existing kitchen, change new exterior walls cover material from stucco to hardy plank siding; remove bathroom in exercise room replace as closet. | |
| Jun 13, 2007 | Completed final sign-off Jul 2007 | 1494 27th Av | 1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced.Details
1 kitchen and 1 bathroom remodeling. replace (6) existing windows/same size, same location. all facing street .67 u factor min. no structural lights being replaced. | $17,000 |
| Oct 14, 2005 | Completed final sign-off Nov 2007 | 9 De Soto St | remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/fDetails
remodeling @ basement including ()n) guest room (n) fam room (n) bath and (n) office remdoel @ 1st floor (kitchen stair to basement and 2/f addition of deck on 1/f @ rear addition on 1/f @ front addition of 2/f | $60,000 |