Back to kitchen remodel contractors
Area Development Inc.
- Based in
- San Mateo
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 21 permits filed
176 permits since 2000: 128 completed, 16 in progress, 22 never finaled, 10 expired or cancelled.
Of the 22 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 14 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 20 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2024 | Completed final sign-off Jul 2024 | 2710 Bryant St | remodeling 1 kitchen & 2 bathroom in kind. install new fixturs & cabinets.no wall removal.Details
remodeling 1 kitchen & 2 bathroom in kind. install new fixturs & cabinets.no wall removal. | $25,000 |
| Apr 12, 2023 | Completed final sign-off Jan 2024 | 4764 Mission St | kitchen remodeling, cabinets and fixtures. change new appliances.Details
kitchen remodeling, cabinets and fixtures. change new appliances. | $20,000 |
| Mar 28, 2023 | Completed final sign-off Jul 2023 | 345 06th St | revision to pa# 202212168543, proposed changes to kitchen layoutDetails
revision to pa# 202212168543, proposed changes to kitchen layout | |
| May 16, 2019 | Completed final sign-off Oct 2019 | 1006 Hollister Av | new kitchen cabinets, counters fixtures 110 sf, 5 baths, new fixtures, tiles, (shower wall floor) drywall remove and patch as needed for fixtures, repair, paint, drywall removal +1-500 sf kitchen and bath wallsDetails
new kitchen cabinets, counters fixtures 110 sf, 5 baths, new fixtures, tiles, (shower wall floor) drywall remove and patch as needed for fixtures, repair, paint, drywall removal +1-500 sf kitchen and bath walls | $95,000 |
| Sep 28, 2018 | Completed final sign-off Oct 2019 | 1006 Hollister Av | new kitchen cabinet and counter w/ fixtures. new bathroom fixtures. drywall removal. replace and repair paint. work in kitchen bathroom and 2 bedroomsDetails
new kitchen cabinet and counter w/ fixtures. new bathroom fixtures. drywall removal. replace and repair paint. work in kitchen bathroom and 2 bedrooms | $20,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2018 | 778 34th Av | convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd.Details
convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd. | $270,000 |
| Dec 16, 2011 | Completed final sign-off May 2012 | 599 Belvedere St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $10,000 |
| Jul 8, 2011 | Completed final sign-off Oct 2012 | 1949 Oak St | proposed relocate the (e) studio unit from 3rd. flr. to 1st. flr. kitchen & bathroom remodeling & minor remodeling @ 2/f. interior remodeling w/ 1-(n) bathrm. @ 3rd. flr. add 1-(n) rear roof deck @ top of bldg. proposed foundation replacement. comply w/ his nov#200344234 dated 11.14.2003.Details
proposed relocate the (e) studio unit from 3rd. flr. to 1st. flr. kitchen & bathroom remodeling & minor remodeling @ 2/f. interior remodeling w/ 1-(n) bathrm. @ 3rd. flr. add 1-(n) rear roof deck @ top of bldg. proposed foundation replacement. comply w/ his nov#200344234 dated 11.14.2003. | $120,000 |
| Dec 29, 2010 | Completed final sign-off Dec 2011 | 1947 Golden Gate Av | partial in-fill of east side lightwell. interior remodel @1st fl w/1 media rm, 1 guest bedrm, 1 bathrm, powder rm. kitchen & bathrm remodeling & minor interior remodeling at 2nd fl, interior remodeling with 1 new bedrm, bathrm by eliminating (e) kitchen on 3rd fl, repl foundation. relocate (e) kitchDetails
partial in-fill of east side lightwell. interior remodel @1st fl w/1 media rm, 1 guest bedrm, 1 bathrm, powder rm. kitchen & bathrm remodeling & minor interior remodeling at 2nd fl, interior remodeling with 1 new bedrm, bathrm by eliminating (e) kitchen on 3rd fl, repl foundation. relocate (e) kitch | $150,000 |
| Oct 27, 2010 | Completed final sign-off Nov 2012 | 757 Natoma St | 1)convert extg storage to a new 3 car garage at 1st floor. 2)enclose one light well at 1st floor. 3)kitchen remodeling in all units. 4) add one new bathroom in all units. 5) foundation replacement and posts removal at 1st floor.Details
1)convert extg storage to a new 3 car garage at 1st floor. 2)enclose one light well at 1st floor. 3)kitchen remodeling in all units. 4) add one new bathroom in all units. 5) foundation replacement and posts removal at 1st floor. | $60,000 |
| Oct 14, 2010 | Completed final sign-off Aug 2011 | 125 Murray St | interior remodeling with 2 new bedrooms & bathroom at 1st floor. proposed kitchen & minor interior remodeling at 2nd floor. foundation & slab replacement, relocate garage to outside parkingDetails
interior remodeling with 2 new bedrooms & bathroom at 1st floor. proposed kitchen & minor interior remodeling at 2nd floor. foundation & slab replacement, relocate garage to outside parking | $150,000 |
| Oct 20, 2009 | Completed final sign-off Jan 2010 | 4079 19th Av | change of use from vacant retail to new office. kitchen added for office use.Details
change of use from vacant retail to new office. kitchen added for office use. | $75,000 |
| Aug 20, 2009 | Completed final sign-off May 2010 | 690 Arkansas St | 1-kitchen & 1-bath remodeling @ 2nd. flr. construction of 2-bedrooms & 2-bathrooms @ (e) first floor storage area. (e) conc. slab @ 1st. floor to be removed & replaced by new slab per plan.Details
1-kitchen & 1-bath remodeling @ 2nd. flr. construction of 2-bedrooms & 2-bathrooms @ (e) first floor storage area. (e) conc. slab @ 1st. floor to be removed & replaced by new slab per plan. | $20,000 |
| Jul 7, 2009 | Completed final sign-off Mar 2010 | 406 18th Av | remodel 3 bathroom (change fixtures), 1 kitchen- new cabient & fixtures, change one garage door, install new garage door same size, electrical & plumbing under separate permit. provide 200 sq inch vent in garage.Details
remodel 3 bathroom (change fixtures), 1 kitchen- new cabient & fixtures, change one garage door, install new garage door same size, electrical & plumbing under separate permit. provide 200 sq inch vent in garage. | $25,000 |
| Mar 30, 2009 | Completed final sign-off Oct 2009 | 736 Lyon St | revin to pa #200504281106 in order to rearrange unit #101 to relocate living/dining & kitchen to g/f. removal of attic bathrm window, minor fl plan modification of unit #201, new large closet on attic fl, new windows at rear.Details
revin to pa #200504281106 in order to rearrange unit #101 to relocate living/dining & kitchen to g/f. removal of attic bathrm window, minor fl plan modification of unit #201, new large closet on attic fl, new windows at rear. | |
| Mar 24, 2009 | Completed final sign-off May 2009 | 624 Belvedere St | remodel 2 kitchen and both unit, repair in kind balcony at front. replace rear windows & front windows comply with 3r-5312.Details
remodel 2 kitchen and both unit, repair in kind balcony at front. replace rear windows & front windows comply with 3r-5312. | $23,000 |
| Jan 27, 2009 | Completed final sign-off Jul 2009 | 149 Topaz Wy | 1)front facade beautification. 2)conversion of extg family room to master bedroom with one walk in closet and master bathroom at lower level 3) kitchen remodeling in kind at 2nd floor 4) proposed 3 new sky lights at roof. 5)replacement of all wndws with double pane aluminum as per plan.Details
1)front facade beautification. 2)conversion of extg family room to master bedroom with one walk in closet and master bathroom at lower level 3) kitchen remodeling in kind at 2nd floor 4) proposed 3 new sky lights at roof. 5)replacement of all wndws with double pane aluminum as per plan. | $35,000 |
| Dec 4, 2008 | Completed final sign-off Jul 2009 | 149 Topaz Wy | kitchen & bathroom (2) remodel. all work to be completed within (e) boundary of a bldg. no sructural work.Details
kitchen & bathroom (2) remodel. all work to be completed within (e) boundary of a bldg. no sructural work. | $20,000 |
| Dec 2, 2008 | Completed final sign-off Jan 2010 | 1825 15th Av | new master bedroom and bath at basement. new stairs to basement and relocate stairs between 1st and 2nd floor. kitchen and bath room at 1st floor per permit# 200811176743. remove walls at 2nd floor.Details
new master bedroom and bath at basement. new stairs to basement and relocate stairs between 1st and 2nd floor. kitchen and bath room at 1st floor per permit# 200811176743. remove walls at 2nd floor. | $95,000 |
| Dec 5, 2007 | Expired or cancelled expired Jan 2010 | 440 Collingwood St | remove/replace kitchen cabinets, minor remove/replacement or dry wall for plumbing & leectrical work.Details
remove/replace kitchen cabinets, minor remove/replacement or dry wall for plumbing & leectrical work. | $6,000 |
| Oct 22, 2007 | Never finaled issued Oct 2007, no final | 2706 Bryant St | work on #2708a. 2 bathroom & 1 kitchen remodeling. change & repair of drywall as needed for upgrading electrical & plumbing, new interior doors & casing raise one windows to accomadate for kitchen countertop.Details
work on #2708a. 2 bathroom & 1 kitchen remodeling. change & repair of drywall as needed for upgrading electrical & plumbing, new interior doors & casing raise one windows to accomadate for kitchen countertop. | $27,000 |
| May 27, 2004 | Completed final sign-off Feb 2008 | 33 Athens St | proposed horiz. addition at front of (e) property, addition will createa new garage at g/f, dining, living, kitchen, 1/2 bath & utility room @ 1st floor and 3 bedroom, 2 full baths, & family room @ 2nd floorDetails
proposed horiz. addition at front of (e) property, addition will createa new garage at g/f, dining, living, kitchen, 1/2 bath & utility room @ 1st floor and 3 bedroom, 2 full baths, & family room @ 2nd floor | $350,000 |