Back to bathroom remodel contractors
Area Development Inc.
- Based in
- San Mateo
- On San Francisco permits
- Jan 2000 to Sep 2026
- Last 24 months
- 21 permits filed
176 permits since 2000: 128 completed, 16 in progress, 22 never finaled, 10 expired or cancelled.
Of the 22 never-finaled permits, 2 are 3 to 5 years old, 6 are 5 to 10 years old, 14 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 25 completed, 2 never finaled, 2 expired or cancelled. Typically 13 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2024 | Completed final sign-off Jul 2024 | 2710 Bryant St | remodeling 1 kitchen & 2 bathroom in kind. install new fixturs & cabinets.no wall removal.Details
remodeling 1 kitchen & 2 bathroom in kind. install new fixturs & cabinets.no wall removal. | $25,000 |
| Nov 15, 2023 | Completed final sign-off Jan 2024 | 4764 Mission St | 2 bathroom remodel, fixture change, added to 202304125588. in kind remodelDetails
2 bathroom remodel, fixture change, added to 202304125588. in kind remodel | $10,000 |
| Jan 21, 2020 | Never finaled issued Apr 2021, no final | 1655 La Salle Av | proposed adu nit of first floor, 3 beds & 2 bath. all within existing bldg boundry per ordinance #162-16Details
proposed adu nit of first floor, 3 beds & 2 bath. all within existing bldg boundry per ordinance #162-16 | $40,000 |
| Dec 12, 2019 | Completed final sign-off May 2024 | 1780 Mckinnon Av | per adu ordinance# 162-16, proposed adu unit on 1st floor. all within (e) building boundary. 3 bedrooms & 2 baths.Details
per adu ordinance# 162-16, proposed adu unit on 1st floor. all within (e) building boundary. 3 bedrooms & 2 baths. | $80,000 |
| Dec 12, 2019 | Completed final sign-off May 2024 | 1784 Mckinnon Av | per adu ordinance# 162-16, proposed adu unit on 1st floor. all within (e) building boundary. 3 bedrooms & 2 baths.Details
per adu ordinance# 162-16, proposed adu unit on 1st floor. all within (e) building boundary. 3 bedrooms & 2 baths. | $40,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2019 | 1006 Hollister Av | to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building.Details
to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building. | $30,000 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 1006 Hollister Av | new kitchen cabinets, counters fixtures 110 sf, 5 baths, new fixtures, tiles, (shower wall floor) drywall remove and patch as needed for fixtures, repair, paint, drywall removal +1-500 sf kitchen and bath wallsDetails
new kitchen cabinets, counters fixtures 110 sf, 5 baths, new fixtures, tiles, (shower wall floor) drywall remove and patch as needed for fixtures, repair, paint, drywall removal +1-500 sf kitchen and bath walls | $95,000 |
| Feb 12, 2019 | Completed final sign-off Jan 2020 | 1747 Cayuga Av | interior remodeling of (e) single family house, add one bedroom & 2 bathrooms at 2nd fl.Details
interior remodeling of (e) single family house, add one bedroom & 2 bathrooms at 2nd fl. | $25,000 |
| Sep 28, 2018 | Completed final sign-off Oct 2019 | 1006 Hollister Av | new kitchen cabinet and counter w/ fixtures. new bathroom fixtures. drywall removal. replace and repair paint. work in kitchen bathroom and 2 bedroomsDetails
new kitchen cabinet and counter w/ fixtures. new bathroom fixtures. drywall removal. replace and repair paint. work in kitchen bathroom and 2 bedrooms | $20,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2018 | 778 34th Av | convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd.Details
convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd. | $270,000 |
| Mar 16, 2012 | Completed final sign-off Aug 2013 | 1402 Sanchez St | proposed new garage at new basement levels, convert (e) storage/basement into living space with 3 new bedroom & 2 new bathrooms. interior remodel of 1st floor-adding 1 powder room, addition of roof deck. all within (e) building boundaryDetails
proposed new garage at new basement levels, convert (e) storage/basement into living space with 3 new bedroom & 2 new bathrooms. interior remodel of 1st floor-adding 1 powder room, addition of roof deck. all within (e) building boundary | $175,000 |
| Dec 16, 2011 | Completed final sign-off May 2012 | 599 Belvedere St | remodel kitchen & bathroom.Details
remodel kitchen & bathroom. | $10,000 |
| Aug 22, 2011 | Completed final sign-off Mar 2015 | 765 South Van Ness Av | interior remodel of all 3 units. conversion of (e) attic to family rm. addition of new deck at unoccupied flat roof at 3rd and 4th fl. addition of 1/2 bath and bar at new fam. rm at attic. add bathrm at 3rd, 2nd and 1st fl. fire sprinkler,fire alarm,standpipes in stairwells under separate permits.Details
interior remodel of all 3 units. conversion of (e) attic to family rm. addition of new deck at unoccupied flat roof at 3rd and 4th fl. addition of 1/2 bath and bar at new fam. rm at attic. add bathrm at 3rd, 2nd and 1st fl. fire sprinkler,fire alarm,standpipes in stairwells under separate permits. | $75,000 |
| Jul 8, 2011 | Completed final sign-off Oct 2012 | 1949 Oak St | proposed relocate the (e) studio unit from 3rd. flr. to 1st. flr. kitchen & bathroom remodeling & minor remodeling @ 2/f. interior remodeling w/ 1-(n) bathrm. @ 3rd. flr. add 1-(n) rear roof deck @ top of bldg. proposed foundation replacement. comply w/ his nov#200344234 dated 11.14.2003.Details
proposed relocate the (e) studio unit from 3rd. flr. to 1st. flr. kitchen & bathroom remodeling & minor remodeling @ 2/f. interior remodeling w/ 1-(n) bathrm. @ 3rd. flr. add 1-(n) rear roof deck @ top of bldg. proposed foundation replacement. comply w/ his nov#200344234 dated 11.14.2003. | $120,000 |
| May 10, 2011 | Completed final sign-off Feb 2012 | 1376 Florida St | revision to pa# 2009.03.27.37.4981. removal of side and rear windows and modification of interior, all within approved building boundary. add 1/2 bathroom on 2nd floor per plan. +--*Details
revision to pa# 2009.03.27.37.4981. removal of side and rear windows and modification of interior, all within approved building boundary. add 1/2 bathroom on 2nd floor per plan. +--* | $2,000 |
| Oct 27, 2010 | Completed final sign-off Nov 2012 | 757 Natoma St | 1)convert extg storage to a new 3 car garage at 1st floor. 2)enclose one light well at 1st floor. 3)kitchen remodeling in all units. 4) add one new bathroom in all units. 5) foundation replacement and posts removal at 1st floor.Details
1)convert extg storage to a new 3 car garage at 1st floor. 2)enclose one light well at 1st floor. 3)kitchen remodeling in all units. 4) add one new bathroom in all units. 5) foundation replacement and posts removal at 1st floor. | $60,000 |
| Oct 14, 2010 | Completed final sign-off Aug 2011 | 125 Murray St | interior remodeling with 2 new bedrooms & bathroom at 1st floor. proposed kitchen & minor interior remodeling at 2nd floor. foundation & slab replacement, relocate garage to outside parkingDetails
interior remodeling with 2 new bedrooms & bathroom at 1st floor. proposed kitchen & minor interior remodeling at 2nd floor. foundation & slab replacement, relocate garage to outside parking | $150,000 |
| Jun 17, 2010 | Expired or cancelled expired Jul 2012 | 74 Macondray Ln | bathroom remodel to include tub replacement, new tile and new plumbing fixtures. no new wall and no existing wall relocation.Details
bathroom remodel to include tub replacement, new tile and new plumbing fixtures. no new wall and no existing wall relocation. | $5,000 |
| Nov 3, 2009 | Expired or cancelled expired Feb 2014 | 223 Anderson St | to comply w/ nov 2009.23264 to peform partial foundation replacement,seismic upgrade and structural upgrade. modify 1st and 2nd floor plans to add 1 new bedroom, 2 new full bathrooms on first floor. new front facade restoration. new rear patio.Details
to comply w/ nov 2009.23264 to peform partial foundation replacement,seismic upgrade and structural upgrade. modify 1st and 2nd floor plans to add 1 new bedroom, 2 new full bathrooms on first floor. new front facade restoration. new rear patio. | $150,000 |
| Aug 20, 2009 | Completed final sign-off May 2010 | 690 Arkansas St | 1-kitchen & 1-bath remodeling @ 2nd. flr. construction of 2-bedrooms & 2-bathrooms @ (e) first floor storage area. (e) conc. slab @ 1st. floor to be removed & replaced by new slab per plan.Details
1-kitchen & 1-bath remodeling @ 2nd. flr. construction of 2-bedrooms & 2-bathrooms @ (e) first floor storage area. (e) conc. slab @ 1st. floor to be removed & replaced by new slab per plan. | $20,000 |
| Jul 7, 2009 | Completed final sign-off Mar 2010 | 406 18th Av | remodel 3 bathroom (change fixtures), 1 kitchen- new cabient & fixtures, change one garage door, install new garage door same size, electrical & plumbing under separate permit. provide 200 sq inch vent in garage.Details
remodel 3 bathroom (change fixtures), 1 kitchen- new cabient & fixtures, change one garage door, install new garage door same size, electrical & plumbing under separate permit. provide 200 sq inch vent in garage. | $25,000 |
| Apr 1, 2009 | Completed final sign-off Mar 2015 | 635 Burnett Av | horizontal addition - proposed enclosure of (e) storage to add additional bedrooms, bathrooms and a new deck to unit #1 at 1st floor. modify 2nd floor bathroom. sprinklers separate permit.Details
horizontal addition - proposed enclosure of (e) storage to add additional bedrooms, bathrooms and a new deck to unit #1 at 1st floor. modify 2nd floor bathroom. sprinklers separate permit. | $50,000 |
| Feb 26, 2009 | Completed final sign-off Oct 2009 | 1250 Missouri St | revision to p.a. 9820407-s3, comply w/ n.o.v. 200858094. provide access to mezzanine levels from corridor. remove bathroom from mezzanine. convert space to closet. remove fireplace in each unit of office/commerical.Details
revision to p.a. 9820407-s3, comply w/ n.o.v. 200858094. provide access to mezzanine levels from corridor. remove bathroom from mezzanine. convert space to closet. remove fireplace in each unit of office/commerical. | $50,000 |
| Jan 27, 2009 | Completed final sign-off Jul 2009 | 149 Topaz Wy | 1)front facade beautification. 2)conversion of extg family room to master bedroom with one walk in closet and master bathroom at lower level 3) kitchen remodeling in kind at 2nd floor 4) proposed 3 new sky lights at roof. 5)replacement of all wndws with double pane aluminum as per plan.Details
1)front facade beautification. 2)conversion of extg family room to master bedroom with one walk in closet and master bathroom at lower level 3) kitchen remodeling in kind at 2nd floor 4) proposed 3 new sky lights at roof. 5)replacement of all wndws with double pane aluminum as per plan. | $35,000 |
| Dec 4, 2008 | Completed final sign-off Jul 2009 | 149 Topaz Wy | kitchen & bathroom (2) remodel. all work to be completed within (e) boundary of a bldg. no sructural work.Details
kitchen & bathroom (2) remodel. all work to be completed within (e) boundary of a bldg. no sructural work. | $20,000 |
| Dec 2, 2008 | Completed final sign-off Jan 2010 | 1825 15th Av | new master bedroom and bath at basement. new stairs to basement and relocate stairs between 1st and 2nd floor. kitchen and bath room at 1st floor per permit# 200811176743. remove walls at 2nd floor.Details
new master bedroom and bath at basement. new stairs to basement and relocate stairs between 1st and 2nd floor. kitchen and bath room at 1st floor per permit# 200811176743. remove walls at 2nd floor. | $95,000 |
| Feb 7, 2008 | Completed final sign-off May 2009 | 230 Pacheco St | 3 story addition, 155 sf per floor. ground floor: exercise room, 1st floor music room, 2nd flr: dressing room. remodel/reconfigure master bath 2nd fl.Details
3 story addition, 155 sf per floor. ground floor: exercise room, 1st floor music room, 2nd flr: dressing room. remodel/reconfigure master bath 2nd fl. | $80,000 |
| Oct 22, 2007 | Never finaled issued Oct 2007, no final | 2706 Bryant St | work on #2708a. 2 bathroom & 1 kitchen remodeling. change & repair of drywall as needed for upgrading electrical & plumbing, new interior doors & casing raise one windows to accomadate for kitchen countertop.Details
work on #2708a. 2 bathroom & 1 kitchen remodeling. change & repair of drywall as needed for upgrading electrical & plumbing, new interior doors & casing raise one windows to accomadate for kitchen countertop. | $27,000 |
| May 27, 2004 | Completed final sign-off Feb 2008 | 33 Athens St | proposed horiz. addition at front of (e) property, addition will createa new garage at g/f, dining, living, kitchen, 1/2 bath & utility room @ 1st floor and 3 bedroom, 2 full baths, & family room @ 2nd floorDetails
proposed horiz. addition at front of (e) property, addition will createa new garage at g/f, dining, living, kitchen, 1/2 bath & utility room @ 1st floor and 3 bedroom, 2 full baths, & family room @ 2nd floor | $350,000 |