Back to kitchen remodel contractors
Ardo Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Mar 2024
- Last 24 months
- 0 permits filed
154 permits since 2000: 104 completed, 35 never finaled, 15 expired or cancelled.
Of the 35 never-finaled permits, 7 are 3 to 5 years old, 18 are 5 to 10 years old, 10 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
36 kitchen remodel permits: 29 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2023 | Completed final sign-off Jul 2024 | 1451 De Haro St | kitchen remodel, alter non load bearing walls, new cabinets.Details
kitchen remodel, alter non load bearing walls, new cabinets. | $20,000 |
| Jun 6, 2023 | Expired or cancelled expired Mar 2026 | 3945 24th St | structural beam eng specs. extend bar, same elec plumbing hookups, non load bearing partitions, sheetrock, carpentry at bar framing to counter top. kitchen pre ex restrooms per existing.202303244396Details
structural beam eng specs. extend bar, same elec plumbing hookups, non load bearing partitions, sheetrock, carpentry at bar framing to counter top. kitchen pre ex restrooms per existing.202303244396 | $50,000 |
| Aug 30, 2022 | Never finaled issued Sep 2022, no final | 2435 15th St | ground fl add full bath shower, sink, toilet. replace rear window with doors, add non structural 1 hr wall. 1st fl replace fixtures in bathroom with shower, tub, sink, add sink to toilet rm, replace kitchen cabinetsDetails
ground fl add full bath shower, sink, toilet. replace rear window with doors, add non structural 1 hr wall. 1st fl replace fixtures in bathroom with shower, tub, sink, add sink to toilet rm, replace kitchen cabinets | $80,000 |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 2454 15th St | kitchen and bathroom renovation.Details
kitchen and bathroom renovation. | $65,000 |
| Jan 21, 2022 | Completed final sign-off Nov 2023 | 58 Waller St | creating one stair run to garage, remodel kitchen, remove wainscot sheetrock that area to match lath and plaster at hall. replace slider at kitchen, no framing same track. structural work will be done per plans.Details
creating one stair run to garage, remodel kitchen, remove wainscot sheetrock that area to match lath and plaster at hall. replace slider at kitchen, no framing same track. structural work will be done per plans. | $50,000 |
| Aug 17, 2021 | Never finaled issued Aug 2021, no final | 919 Divisadero St | 1. resurface kitchen floors with aedex concrete (1/2)" and top with epoxy sealer. (3 coats) 2. install 24' of 1" gas line and 8 shutoff valves.Details
1. resurface kitchen floors with aedex concrete (1/2)" and top with epoxy sealer. (3 coats) 2. install 24' of 1" gas line and 8 shutoff valves. | $8,000 |
| Mar 24, 2021 | Never finaled issued Mar 2021, no final | 1670 Page St | upgrade 1 kitchen and 1 bathroom in-kind. no structural work.Details
upgrade 1 kitchen and 1 bathroom in-kind. no structural work. | $18,000 |
| Mar 24, 2021 | Never finaled issued Mar 2021, no final | 1672 Page St | upgrade 1 kitchen and 1 bathroom in-kind. no structural work.Details
upgrade 1 kitchen and 1 bathroom in-kind. no structural work. | $18,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2020 | 60 Waller St | remove and replace cabinets, appliances at kitchen, replace shower in bathroom.Details
remove and replace cabinets, appliances at kitchen, replace shower in bathroom. | $25,000 |
| Sep 12, 2019 | Completed final sign-off Jun 2020 | 225 San Jose Av | unit 227: water damage to ceiling and walls at bathroom and kitchen removed replace tile at bathroom new sheetrock approx 225 sq ft repalce vanity.Details
unit 227: water damage to ceiling and walls at bathroom and kitchen removed replace tile at bathroom new sheetrock approx 225 sq ft repalce vanity. | $15,000 |
| Jul 26, 2019 | Completed final sign-off Jan 2020 | 2443 15th St | revision to pa 201901049613. at kitchen remove cabinet plaster to studs at walls and ceiling insulate sheet rock. install cabinetsDetails
revision to pa 201901049613. at kitchen remove cabinet plaster to studs at walls and ceiling insulate sheet rock. install cabinets | $5,200 |
| May 24, 2019 | Completed final sign-off Jan 2020 | 18 Eagle St | remodel kitchen. sheetrock, cabinets, tiles. no load bearing walls will be altered. all work to be done at rear of buldingDetails
remodel kitchen. sheetrock, cabinets, tiles. no load bearing walls will be altered. all work to be done at rear of bulding | $45,000 |
| Jan 4, 2019 | Completed final sign-off Jan 2020 | 2443 15th St | grnd flr - add full bathroom shower sink toilet. replace rear window w/door glass add non structural 1st flr - repace fixtures in bathrrom with shower tub sink add sink to toilet room. replace kitchen cabinetsDetails
grnd flr - add full bathroom shower sink toilet. replace rear window w/door glass add non structural 1st flr - repace fixtures in bathrrom with shower tub sink add sink to toilet room. replace kitchen cabinets | $43,000 |
| Jul 2, 2018 | Completed final sign-off Sep 2018 | 1510 Guerrero St | remove replace cabinets, new fixtures in kitchen, tile at tub & floors in bathroom,approx 200 sq ft.Details
remove replace cabinets, new fixtures in kitchen, tile at tub & floors in bathroom,approx 200 sq ft. | $30,000 |
| Nov 7, 2017 | Completed final sign-off Dec 2017 | 3491 20th St | comply with novs 201622291, 201622294, 201409753 remodel 2 baths, 1 kitchen at 2nd flDetails
comply with novs 201622291, 201622294, 201409753 remodel 2 baths, 1 kitchen at 2nd fl | |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 3491 20th St | replace non-gfci controlled receptacles in kitchen & bath, to comply with nov 201409753, electrical only on 2/f.Details
replace non-gfci controlled receptacles in kitchen & bath, to comply with nov 201409753, electrical only on 2/f. | $1,700 |
| Mar 2, 2017 | Expired or cancelled withdrawn Oct 2020 | 635 28th St | create 2nd unit per ordinance no# 162-16: sheet rock, insulation, vinyal floors throughout. mo framing changes. cabinets, countertop. remodel studio and install ele & plumb. legalize non permited studio & bath. add kitchen. structural covered by separate permit.Details
create 2nd unit per ordinance no# 162-16: sheet rock, insulation, vinyal floors throughout. mo framing changes. cabinets, countertop. remodel studio and install ele & plumb. legalize non permited studio & bath. add kitchen. structural covered by separate permit. | $15,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 470 La Grande Av | 144 sf remodel kitchen cabinets, floor tileDetails
144 sf remodel kitchen cabinets, floor tile | $12,000 |
| Jul 7, 2015 | Completed final sign-off Dec 2015 | 3052 Polk St | remodel kitchen and bath, upgrade elec and plumbing to comply with current code. kitchen 110 sf, bath 40 sfDetails
remodel kitchen and bath, upgrade elec and plumbing to comply with current code. kitchen 110 sf, bath 40 sf | $42,000 |
| Apr 16, 2015 | Completed final sign-off Aug 2015 | 106 Wool St | to comply with complaint #201538381: replace (e) kitchen cabinetry with new. add new appliances, new ceramic tile. replace ceramic tile in bathroom. new bathroom fixtures.Details
to comply with complaint #201538381: replace (e) kitchen cabinetry with new. add new appliances, new ceramic tile. replace ceramic tile in bathroom. new bathroom fixtures. | $45,000 |
| Apr 13, 2015 | Completed final sign-off Jul 2015 | 66 Cleary Ct | unit #1302 - r&r cabinets at kitchen. update plumb, elect. alter non-bearing pony wall.Details
unit #1302 - r&r cabinets at kitchen. update plumb, elect. alter non-bearing pony wall. | $13,000 |
| Mar 3, 2015 | Completed final sign-off Jun 2015 | 567 Minna St | unit a: remodel kitchen - cabinets, tile approximately 11' x 12', 132 sq. ft.Details
unit a: remodel kitchen - cabinets, tile approximately 11' x 12', 132 sq. ft. | $15,000 |
| Feb 19, 2014 | Completed final sign-off Mar 2015 | 475 Ralston St | reconfiguration of some interior walls, insulation, repair of exisitng windows, new wiring, kitchen & bath. install skylightsDetails
reconfiguration of some interior walls, insulation, repair of exisitng windows, new wiring, kitchen & bath. install skylights | $100,000 |
| Feb 18, 2014 | Completed final sign-off Dec 2014 | 1131 Church St | remodel kitchen, bath, and modifications to closetsDetails
remodel kitchen, bath, and modifications to closets | $25,000 |
| Dec 3, 2013 | Completed final sign-off Jan 2014 | 911 Innes Av | remodel kitchen cabinets plumbing and electrical floating floors, no structural patch and paint, area 11x12Details
remodel kitchen cabinets plumbing and electrical floating floors, no structural patch and paint, area 11x12 | $25,000 |
| Nov 28, 2012 | Completed final sign-off Apr 2013 | 66 Cleary Ct | unit 606: remodel kitchen & 2 bathrooms, (n) floors, tile & wood. all demolition. no load bearing walls. kitchen permanent lighting shall have a min. of 50% total wattage beigh high efficacy. no lighting alteration in bathroom. no duct work alteration.Details
unit 606: remodel kitchen & 2 bathrooms, (n) floors, tile & wood. all demolition. no load bearing walls. kitchen permanent lighting shall have a min. of 50% total wattage beigh high efficacy. no lighting alteration in bathroom. no duct work alteration. | $39,000 |
| Jul 5, 2012 | Completed final sign-off Nov 2012 | 66 Cleary Ct | unit #609 - remodel kitchen & 2 baths, replace all doors excluding entrance, no load bearing walls will be affected.Details
unit #609 - remodel kitchen & 2 baths, replace all doors excluding entrance, no load bearing walls will be affected. | $35,000 |
| Jun 6, 2012 | Completed final sign-off Nov 2012 | 195 25th Av | unit #401-remove & repl all doors, jams & casing. demolish & remove cabinets at kitchen, wall surfaces to access plumbing & electrical. walls to be altered are non load bearingDetails
unit #401-remove & repl all doors, jams & casing. demolish & remove cabinets at kitchen, wall surfaces to access plumbing & electrical. walls to be altered are non load bearing | $25,000 |
| Feb 10, 2012 | Completed final sign-off Mar 2013 | 195 25th Av | #301 -remove non load bearing wall at kitchen. remodel kitchen and bathroom, tile work & replace cabinets.Details
#301 -remove non load bearing wall at kitchen. remodel kitchen and bathroom, tile work & replace cabinets. | $20,000 |
| Oct 14, 2009 | Completed final sign-off Dec 2009 | 160 Chaves Av | to comply with nov# 200919024. remove illegal kitchen at garage level and legalize jacuzzi, rear stair and deck. new wall btn garage and interior stair & repair stairs.Details
to comply with nov# 200919024. remove illegal kitchen at garage level and legalize jacuzzi, rear stair and deck. new wall btn garage and interior stair & repair stairs. | $5,000 |
| Nov 13, 2007 | Completed final sign-off May 2008 | 136 Marietta Dr | new interior stair configuration rebuild walls create storage room, 2 new closets walls at storage room non-load bearing on 1st floor. new skylight at stairs, new door to bedroom upstair, kitchen upgrade.Details
new interior stair configuration rebuild walls create storage room, 2 new closets walls at storage room non-load bearing on 1st floor. new skylight at stairs, new door to bedroom upstair, kitchen upgrade. | $30,000 |
| Oct 22, 2007 | Completed final sign-off May 2008 | 136 Marietta Dr | remodel kitchen 2 baths to replace exist, reframe exit walls at same to accomendate plumb upgrade. remove sheetrock in these areas to allow for insulation rerock new floor tile or wood, no structural work. 50% fluorescent in cadescent- switched seperately (kitchen) bath fluorescent or manual on autoDetails
remodel kitchen 2 baths to replace exist, reframe exit walls at same to accomendate plumb upgrade. remove sheetrock in these areas to allow for insulation rerock new floor tile or wood, no structural work. 50% fluorescent in cadescent- switched seperately (kitchen) bath fluorescent or manual on auto | $60,000 |
| Jan 22, 2007 | Completed final sign-off Mar 2007 | 2348 Jones St | one kitchen and laundry room. upgrade both area electrical wor to be done. plumbing to facilitate new dishwasher. insulate at laundry double 5/8 finish gyp on property wall. new cabinets in kitchen, counter top. no structural work.Details
one kitchen and laundry room. upgrade both area electrical wor to be done. plumbing to facilitate new dishwasher. insulate at laundry double 5/8 finish gyp on property wall. new cabinets in kitchen, counter top. no structural work. | $17,000 |
| Apr 7, 2006 | Completed final sign-off Aug 2006 | 2654 Union St | kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lightingDetails
kitchen remodel. remove and replace cabinets, upgrade electrical and plumbing and floor covering. no structural changes. flourescent lighting | $25,000 |
| May 21, 2001 | Completed final sign-off Oct 2001 | 224 Filbert St | renovation of kitchen, cosmetic sheetrock, tile cabinets insulation will be installedDetails
renovation of kitchen, cosmetic sheetrock, tile cabinets insulation will be installed | $25,000 |
| May 21, 2001 | Completed final sign-off Sep 2001 | 226 Filbert St | remodel kitchen & bath level ceiling using metal studs, no structural add closet at liviing rm,Details
remodel kitchen & bath level ceiling using metal studs, no structural add closet at liviing rm, | $10,000 |