Archteype Design Builder
- Based in
- San Rafael
- On San Francisco permits
- Apr 2000 to Jun 2026
- Last 24 months
- 3 permits filed
48 permits since 2000: 40 completed, 5 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 3 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2021 | Completed final sign-off May 2022 | 587 24th Av | add 687 sf of habitable space on (e) 1st fl including infilling under rear cantilevered area. add (n) stairs along rear interior of bldg. remove (e) exterior & interior stairs. reconfigure bedroom layout at 3rd fl & add (n) bathroom & remodel (e) bathroom. add powder room at 2nd fl.Details
add 687 sf of habitable space on (e) 1st fl including infilling under rear cantilevered area. add (n) stairs along rear interior of bldg. remove (e) exterior & interior stairs. reconfigure bedroom layout at 3rd fl & add (n) bathroom & remodel (e) bathroom. add powder room at 2nd fl. | $300,000 |
| Jun 8, 2015 | Completed final sign-off Jul 2016 | 1422 06th Av | for unit 1422 upper unit only. reconfigure the main living area per plan shown. add new stairway to access attic non-habitale space. add one full bathroom and washer/dryer. remodel existing bath per plan.Details
for unit 1422 upper unit only. reconfigure the main living area per plan shown. add new stairway to access attic non-habitale space. add one full bathroom and washer/dryer. remodel existing bath per plan. | $100,000 |
| Feb 5, 2014 | Completed final sign-off Jul 2014 | 601 Van Ness Av | new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting.Details
new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting. | $72,000 |