Back to kitchen remodel contractors
Archteype Design Builder
- Based in
- San Rafael
- On San Francisco permits
- Apr 2000 to Jun 2026
- Last 24 months
- 3 permits filed
48 permits since 2000: 40 completed, 5 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 17 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2024 | In progress issued Oct 2024 | 1960 Broadway | unit #7 - remodel (e) bedrooms, (e) kitchen, (e) bathrooms; build (n) closets; install (n) lights in all rooms; install (n) switches in all rooms; replace (e) windows @ front of building 5 windows, true dvided lites, single hung to be replaced like for likeDetails
unit #7 - remodel (e) bedrooms, (e) kitchen, (e) bathrooms; build (n) closets; install (n) lights in all rooms; install (n) switches in all rooms; replace (e) windows @ front of building 5 windows, true dvided lites, single hung to be replaced like for like | $30,000 |
| Dec 20, 2023 | Completed final sign-off Apr 2024 | 1000 Green St | in like in kind kitchen removel with new cabinets, stone counters, and appliances for penthouse #1.Details
in like in kind kitchen removel with new cabinets, stone counters, and appliances for penthouse #1. | $49,000 |
| Jun 27, 2023 | Completed final sign-off Jul 2024 | 1660 Shrader St | convert (e) powder room into full bathroom & add kitchenette to rec. room.Details
convert (e) powder room into full bathroom & add kitchenette to rec. room. | $20,552 |
| Nov 9, 2022 | Completed final sign-off Oct 2024 | 1923 Pierce St | foundation replacement: replace all extg brick foundation with concrete structure. build out basement level with mud room, media room and bathroom. upstairs: install new header at kitchen to backyard doorway, reconfigure garage level secondary egress through side yard.Details
foundation replacement: replace all extg brick foundation with concrete structure. build out basement level with mud room, media room and bathroom. upstairs: install new header at kitchen to backyard doorway, reconfigure garage level secondary egress through side yard. | $375,000 |
| Jul 20, 2022 | Completed final sign-off Oct 2024 | 1923 Pierce St | paint full interior, remodel masterbath in like kind. remodel top floor guest bath in like kind. remodel entry level powder room in like kind. remodel kitchen in like kind. build out master bedroom closet. refinish all extg wood floors.Details
paint full interior, remodel masterbath in like kind. remodel top floor guest bath in like kind. remodel entry level powder room in like kind. remodel kitchen in like kind. build out master bedroom closet. refinish all extg wood floors. | $149,000 |
| Feb 12, 2021 | Completed final sign-off Nov 2021 | 1901 California St | in like kind remodel of 2 bathrooms and kitchen. refinish floors, paint all areas, new led high efficacy lighting cans installed, and replace 12 failed windows in same spot and same openings. u- factor 0.30maxDetails
in like kind remodel of 2 bathrooms and kitchen. refinish floors, paint all areas, new led high efficacy lighting cans installed, and replace 12 failed windows in same spot and same openings. u- factor 0.30max | $89,000 |
| Sep 2, 2020 | Completed final sign-off Nov 2020 | 550 Davis St | in-kind remodel working: replace kitchen cabinets between ktichen & dining room & new stone counters, rpelce tile splash @ kitchens, remodel & replce office, cabinets & related electrical work, install new wine chiller, microwave & steam generator.Details
in-kind remodel working: replace kitchen cabinets between ktichen & dining room & new stone counters, rpelce tile splash @ kitchens, remodel & replce office, cabinets & related electrical work, install new wine chiller, microwave & steam generator. | $27,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 880 Ashbury St | in-kind cosmetic remodel as follows: install new steel doorway between kitchen@ nook. modifty kitchen cbinets for new fref, install a/c for wire room, paint interior, replce kitchen counters, new built-in cabinets at living room/nook/masterbed closets.Details
in-kind cosmetic remodel as follows: install new steel doorway between kitchen@ nook. modifty kitchen cbinets for new fref, install a/c for wire room, paint interior, replce kitchen counters, new built-in cabinets at living room/nook/masterbed closets. | $128,000 |
| Aug 14, 2020 | Completed final sign-off Mar 2021 | 1150 Sacramento St | cosmetic remodel: refinish wood floors, add tile at entry floor, replace all existing can lights with high efficacy led units & new switching, replace office and tv cabinets, install moldings at master bedroom (room ~330sqft), replace kitchen and bar faucets. (kitchen ~120 sqft). all work in kind.Details
cosmetic remodel: refinish wood floors, add tile at entry floor, replace all existing can lights with high efficacy led units & new switching, replace office and tv cabinets, install moldings at master bedroom (room ~330sqft), replace kitchen and bar faucets. (kitchen ~120 sqft). all work in kind. | $175,000 |
| Jul 2, 2019 | Completed final sign-off Jun 2020 | 368 Elm St | unit 307 - in like kind remodel of 2 bathrooms & kitchen; install new high efficacy led can lights & replacing all existing units; replace wood flooring with new wood flooring over sound matDetails
unit 307 - in like kind remodel of 2 bathrooms & kitchen; install new high efficacy led can lights & replacing all existing units; replace wood flooring with new wood flooring over sound mat | $97,000 |
| Sep 12, 2018 | Completed final sign-off Nov 2019 | 1879 Funston Av | interior remodel consisting of reconfiguring kitchen/dining area, removing interior post at 2nd & 3rd floors, remodeling extg bathrooms at 3rd floor, add new bathroom at 4th floor, changing finish at front facade.Details
interior remodel consisting of reconfiguring kitchen/dining area, removing interior post at 2nd & 3rd floors, remodeling extg bathrooms at 3rd floor, add new bathroom at 4th floor, changing finish at front facade. | $195,000 |
| May 30, 2018 | Completed final sign-off Feb 2019 | 1333 Jones St | #607: remodel kitchen, master bathroom, guest bathroom. refinish (e) wood floor, install new he led can lights, paint all interior, new gyp at ceiling.Details
#607: remodel kitchen, master bathroom, guest bathroom. refinish (e) wood floor, install new he led can lights, paint all interior, new gyp at ceiling. | $197,000 |
| Aug 2, 2017 | Completed final sign-off May 2018 | 1333 Jones St | remodel kitchen, master bathroom guest bathroom, like kind , in unit # 1102, refinish floor & paintDetails
remodel kitchen, master bathroom guest bathroom, like kind , in unit # 1102, refinish floor & paint | $190,000 |
| Mar 17, 2017 | Completed final sign-off Jul 2017 | 1896 Pacific Av | #102: remodel kitchen and entryDetails
#102: remodel kitchen and entry | $42,000 |
| Dec 5, 2016 | Completed final sign-off Apr 2017 | 900 North Point St | remodel kitchen, remove non bearing wall at kitchen, raise wall and reduce glass at bath 1, extend non bearing wall at master bedroom, misc lighting work, tile fireplace surround, install sound wndws at bedrooms, leave e exterior windows in place, replace wood flooring all work in clocktower bldgDetails
remodel kitchen, remove non bearing wall at kitchen, raise wall and reduce glass at bath 1, extend non bearing wall at master bedroom, misc lighting work, tile fireplace surround, install sound wndws at bedrooms, leave e exterior windows in place, replace wood flooring all work in clocktower bldg | $67,000 |
| Oct 28, 2015 | Completed final sign-off Dec 2015 | 1283 06th Av | revision to 201506259816. add repair beam at kitchenDetails
revision to 201506259816. add repair beam at kitchen | $8,500 |
| Feb 9, 2015 | Completed final sign-off Aug 2015 | 946 De Haro St | remodel 2/f kitchen, paint interior, finishes & fixtures only, no walls to be done. no structural work.Details
remodel 2/f kitchen, paint interior, finishes & fixtures only, no walls to be done. no structural work. | $38,000 |
| Feb 5, 2014 | Completed final sign-off Jul 2014 | 601 Van Ness Av | new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting.Details
new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting. | $72,000 |
| Apr 13, 2001 | Expired or cancelled expired Aug 2001 | 2241 Sacramento St | rev to permit 928666 (relocate flue @kitchen)Details
rev to permit 928666 (relocate flue @kitchen) | $250 |
| Apr 20, 2000 | Expired or cancelled expired Oct 2001 | 870 Ashbury St | remodel existing family rm, kitchen & dinning roomsDetails
remodel existing family rm, kitchen & dinning rooms | $122,000 |