Archetype Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Jan 2026
- Last 24 months
- 2 permits filed
10 permits since 2000: 4 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 10 days from filing to permit and 470 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2024 | Completed final sign-off Dec 2025 | 138 28th Av | repair front stairs less than 50%Details
repair front stairs less than 50% | $1,500 |
| Feb 26, 2024 | In progress issued Mar 2024 | 1942 Sutter St | to comply with nov 202288095. infill where window(s) were removed. new wood entry stair and wood trail to match original. removal of wood siding to install sheathing and waterproofing. reinstallation of wood siding. replacement of (e) windows with new to match (e). repair (e) concrete pillarDetails
to comply with nov 202288095. infill where window(s) were removed. new wood entry stair and wood trail to match original. removal of wood siding to install sheathing and waterproofing. reinstallation of wood siding. replacement of (e) windows with new to match (e). repair (e) concrete pillar | $5,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2023 | 2954 23rd St | remodel at first and second floor of (e) house. first floor remodel includes (n) floor slab with (n) kitchen, (n) dining and living area, (n) pantry, (n) pwdr rm, and (n) vestibule entry. (n) main stair to remodeled second floor w/ 2 bedrooms, master suite, laundry rm, and office area.Details
remodel at first and second floor of (e) house. first floor remodel includes (n) floor slab with (n) kitchen, (n) dining and living area, (n) pantry, (n) pwdr rm, and (n) vestibule entry. (n) main stair to remodeled second floor w/ 2 bedrooms, master suite, laundry rm, and office area. | $500,000 |