Back to kitchen remodel contractors
Archetype Construction Corp
- Based in
- San Francisco
- On San Francisco permits
- Aug 2017 to Jan 2026
- Last 24 months
- 2 permits filed
10 permits since 2000: 4 completed, 2 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 70 days from filing to permit and 708 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2024 | Expired or cancelled cancelled Jul 2025 | 3936 21st St | kitchen and bathroom renovation. kitchen - new floor, new counter top, new cabinets. bathroom - new tiles, new vanities, non structuralDetails
kitchen and bathroom renovation. kitchen - new floor, new counter top, new cabinets. bathroom - new tiles, new vanities, non structural | $50,000 |
| Apr 14, 2023 | Completed final sign-off Jan 2026 | 138 28th Av | residential remodel of sfd including: infill existing lightwell and area below 2nd fl. add 2nd fl deck, convert 3rd fl roof to usable deck. full interior remodel including kitchen and add 1 new bathroom.Details
residential remodel of sfd including: infill existing lightwell and area below 2nd fl. add 2nd fl deck, convert 3rd fl roof to usable deck. full interior remodel including kitchen and add 1 new bathroom. | $450,000 |
| Mar 27, 2023 | Never finaled issued Mar 2023, no final | 138 28th Av | one kitchen and one bathroom renovation. kitchen: new floor, new countertop, new cabinets. bathroom: new tiles, new vanities.Details
one kitchen and one bathroom renovation. kitchen: new floor, new countertop, new cabinets. bathroom: new tiles, new vanities. | $15,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2023 | 2954 23rd St | remodel at first and second floor of (e) house. first floor remodel includes (n) floor slab with (n) kitchen, (n) dining and living area, (n) pantry, (n) pwdr rm, and (n) vestibule entry. (n) main stair to remodeled second floor w/ 2 bedrooms, master suite, laundry rm, and office area.Details
remodel at first and second floor of (e) house. first floor remodel includes (n) floor slab with (n) kitchen, (n) dining and living area, (n) pantry, (n) pwdr rm, and (n) vestibule entry. (n) main stair to remodeled second floor w/ 2 bedrooms, master suite, laundry rm, and office area. | $500,000 |