Back to kitchen remodel contractors
Arcad Builders
- Based in
- San Bruno
- On San Francisco permits
- Jun 2011 to Jun 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 260 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2012 | Completed final sign-off Oct 2013 | 2660 Harrison St | altered storefront. new commerical kitchen (mech on separate permit). retail display. electrical & plumbing. modification of bldg pa # 201012307638 w/accessible ramp, bathroom, sprinklers.Details
altered storefront. new commerical kitchen (mech on separate permit). retail display. electrical & plumbing. modification of bldg pa # 201012307638 w/accessible ramp, bathroom, sprinklers. | $125,000 |
| Jun 1, 2011 | Never finaled issued Sep 2012, no final | 2872 Pine St | rear yard addition to reclaim existing upper floor deck over ground fl habitable space for new interior space. existing g/f deck to be raised by 20" to match height of the g/f. interior remodel renovation kitchen, relocation of lower level stairs & renovation of existing office at basement level.Details
rear yard addition to reclaim existing upper floor deck over ground fl habitable space for new interior space. existing g/f deck to be raised by 20" to match height of the g/f. interior remodel renovation kitchen, relocation of lower level stairs & renovation of existing office at basement level. | $175,000 |