Back to bathroom remodel contractors
Arcad Builders
- Based in
- San Bruno
- On San Francisco permits
- Jun 2011 to Jun 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 4 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2013 | Completed final sign-off Feb 2014 | 722 Hampshire St | remodel of (e) sfd. master bathroom renovation, which includes a replacement of the (e) windows. master bedroom renovations which include: modification of (e) interior non structural partitions. modification of (e) interior structural elements. relocation of (e) exteriro window to accommodate moDetails
remodel of (e) sfd. master bathroom renovation, which includes a replacement of the (e) windows. master bedroom renovations which include: modification of (e) interior non structural partitions. modification of (e) interior structural elements. relocation of (e) exteriro window to accommodate mo | $56,357 |
| Oct 22, 2012 | Completed final sign-off Oct 2013 | 2660 Harrison St | altered storefront. new commerical kitchen (mech on separate permit). retail display. electrical & plumbing. modification of bldg pa # 201012307638 w/accessible ramp, bathroom, sprinklers.Details
altered storefront. new commerical kitchen (mech on separate permit). retail display. electrical & plumbing. modification of bldg pa # 201012307638 w/accessible ramp, bathroom, sprinklers. | $125,000 |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 809 Florida St | coversion of existing unconditioned garage flr space for new interior conditioned 1st flr space. replace (e) stairs, add (n) 1st flr bath, (n) rear windows and door, new fixtures and finsihes in 1st flr. add skylight over stair.Details
coversion of existing unconditioned garage flr space for new interior conditioned 1st flr space. replace (e) stairs, add (n) 1st flr bath, (n) rear windows and door, new fixtures and finsihes in 1st flr. add skylight over stair. | $125,000 |
| May 10, 2012 | Completed final sign-off Oct 2012 | 333 Oak Park Dr | interior remodel of extg upper floor bathrooms. replace fixtures in extg locations. replace furnace.Details
interior remodel of extg upper floor bathrooms. replace fixtures in extg locations. replace furnace. | $30,000 |