Back to kitchen remodel contractors
Appetite For Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Apr 2026
- Last 24 months
- 18 permits filed
50 permits since 2000: 33 completed, 14 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 10 completed, 3 in progress, 1 expired or cancelled. Typically 3 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2025 | In progress issued Dec 2025 | 57 Winfield St | reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2.Details
reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2. | $125,000 |
| Apr 18, 2025 | Completed final sign-off Jan 2026 | 325 Capp St | unit b (rear building) - revision to permit 202501037713. rebuild interior bedroom wall in kind, new bedroom/kitchen wall, new closet, pantry. no layout changes from approved plan.Details
unit b (rear building) - revision to permit 202501037713. rebuild interior bedroom wall in kind, new bedroom/kitchen wall, new closet, pantry. no layout changes from approved plan. | |
| Jan 24, 2025 | Completed final sign-off Mar 2025 | 428 Colon Av | remodel kitchen in kind no layout change or wall removalDetails
remodel kitchen in kind no layout change or wall removal | $20,000 |
| Jan 24, 2025 | Completed final sign-off Jun 2025 | 1 Wattson Pl | remodel kitchen and bathroom in kind no wall removal or layout change. replace water damamge drywall and insulation due to water damageDetails
remodel kitchen and bathroom in kind no wall removal or layout change. replace water damamge drywall and insulation due to water damage | $50,000 |
| Jan 3, 2025 | Completed final sign-off Jan 2026 | 325 Capp St | unit b (rear building): kitchen remodel, replace bathroom floor in kind, shift bedroom wall, roof repair. (ref pa# 202501037714 for re-roofing)Details
unit b (rear building): kitchen remodel, replace bathroom floor in kind, shift bedroom wall, roof repair. (ref pa# 202501037714 for re-roofing) | $40,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 3949 21st St | one kitchen and one bath remodel in kind. exist walls and openings to remain.Details
one kitchen and one bath remodel in kind. exist walls and openings to remain. | $40,000 |
| Feb 8, 2024 | In progress issued Apr 2024 | 688 Guerrero St | renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit.Details
renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit. | $222,967 |
| Feb 13, 2019 | Completed final sign-off Aug 2019 | 55 Hernandez Av | replace (e) window for double door and replace (e) windows at kitchen in rear facade. replace (e) doors at bedroom at rear facade. including shearwalls & hd's at line 5. ref pa#201812128164Details
replace (e) window for double door and replace (e) windows at kitchen in rear facade. replace (e) doors at bedroom at rear facade. including shearwalls & hd's at line 5. ref pa#201812128164 | $4,500 |
| Dec 12, 2018 | Expired or cancelled cancelled Jan 2026 | 55 Hernandez Av | 1st fl - create 2 (n) bedrooms and 1 (n) bathroom; expand garage door to 10"-0'; build (n) open stair to connect to 2nd fl; 2nd fl - move kitchen to location of current bathroom; build 2 (n) bathrooms.Details
1st fl - create 2 (n) bedrooms and 1 (n) bathroom; expand garage door to 10"-0'; build (n) open stair to connect to 2nd fl; 2nd fl - move kitchen to location of current bathroom; build 2 (n) bathrooms. | $85,000 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 3436 18th St | (1) kitchen remodel in-kind, new cabinets/counter, electrical up to code, no rough framing/change of (e) layoutDetails
(1) kitchen remodel in-kind, new cabinets/counter, electrical up to code, no rough framing/change of (e) layout | $5,000 |
| May 22, 2017 | Completed final sign-off Sep 2017 | 1990 18th Av | kitchen remodel - replace cabs/bring electrical up to dateDetails
kitchen remodel - replace cabs/bring electrical up to date | $10,000 |
| Apr 15, 2016 | Completed final sign-off Jan 2017 | 260 05th St | change of use for limited cafe space, kitchen, storage space, seating, ada restroom, nw fixtures and finishes. sprinkler under separate permit. n/a for maherDetails
change of use for limited cafe space, kitchen, storage space, seating, ada restroom, nw fixtures and finishes. sprinkler under separate permit. n/a for maher | $90,000 |
| Jan 30, 2015 | Completed final sign-off Jul 2015 | 1819 45th Av | interior remodel, remove walls between living, dining & kitchen. remodel kitchen, replace 1 window.Details
interior remodel, remove walls between living, dining & kitchen. remodel kitchen, replace 1 window. | $50,000 |
| Mar 23, 2011 | Completed final sign-off Jun 2011 | 740 Grand View Av | remove non load bearing wall in kitchen and install new island. relocate electricalDetails
remove non load bearing wall in kitchen and install new island. relocate electrical | $10,000 |