Back to bathroom remodel contractors
Appetite For Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Apr 2026
- Last 24 months
- 18 permits filed
50 permits since 2000: 33 completed, 14 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 10 completed, 7 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued Jun 2026 | 57 Winfield St | revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath.Details
revision to pa# 202601224358, add a decorative stained glass window to the street facing facade. minor revisons to exterior finishes. new scope of work to remodel bath. | $27,000 |
| Jan 22, 2026 | In progress issued Mar 2026 | 57 Winfield St | replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced.Details
replace and center all windows in living room & primary bedroom on front facade. replace and shift primary bathroom window and add skylight to same bathroom. side door near front facade replaced w/a window. rear patio door replaced. rear 1st fl bedroom window replaced. | $70,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 57 Winfield St | reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2.Details
reconfigure 2 laundry room walls in the garage. remodel the kitchen, living and bathroom on level 1. add remodel the primary bathroom on the level 2. | $125,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 57 Winfield St | relocate and remodel bedroom, bath on floor 3 at the rear of the house. skylight added over new bathroom. home office added to the rear of house level 3. all work in existing footprint and no chang to front facade.Details
relocate and remodel bedroom, bath on floor 3 at the rear of the house. skylight added over new bathroom. home office added to the rear of house level 3. all work in existing footprint and no chang to front facade. | $48,000 |
| Aug 4, 2025 | In progress issued Mar 2026 | 1454 Cortland Av | vertical addition for a new master suite with a bathroom, a bedroom, and walk-in closet. an attic access door will be provided.adu issued sep pa202301109994. toter storage, reconfi entry stair, hand/guardrail, deck over garage, new retaining wall, light andDetails
vertical addition for a new master suite with a bathroom, a bedroom, and walk-in closet. an attic access door will be provided.adu issued sep pa202301109994. toter storage, reconfi entry stair, hand/guardrail, deck over garage, new retaining wall, light and | $282,816 |
| Aug 4, 2025 | Completed final sign-off Oct 2025 | 1220 16th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $10,561 |
| Jan 24, 2025 | Completed final sign-off Jun 2025 | 1 Wattson Pl | remodel kitchen and bathroom in kind no wall removal or layout change. replace water damamge drywall and insulation due to water damageDetails
remodel kitchen and bathroom in kind no wall removal or layout change. replace water damamge drywall and insulation due to water damage | $50,000 |
| Jan 3, 2025 | Completed final sign-off Jan 2026 | 325 Capp St | unit b (rear building): kitchen remodel, replace bathroom floor in kind, shift bedroom wall, roof repair. (ref pa# 202501037714 for re-roofing)Details
unit b (rear building): kitchen remodel, replace bathroom floor in kind, shift bedroom wall, roof repair. (ref pa# 202501037714 for re-roofing) | $40,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 3949 21st St | one kitchen and one bath remodel in kind. exist walls and openings to remain.Details
one kitchen and one bath remodel in kind. exist walls and openings to remain. | $40,000 |
| Feb 8, 2024 | In progress issued Apr 2024 | 688 Guerrero St | renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit.Details
renovate unit 688. kitchen remodel. addition of second bathroom. replace windows facing rear uard with patio door. in kind replacement of front door. all work at the ground floor unit. | $222,967 |
| Oct 17, 2023 | Completed final sign-off Apr 2024 | 341 27th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,000 |
| Jul 10, 2019 | Completed final sign-off Dec 2019 | 11 Perego Tr | unit 5: bathroom remodel in-kind (55 sq. ft.), install dryer in closet, provide min 100 sq. inch opening, vent dryer to outside @ min 3' from property, and any building opening.Details
unit 5: bathroom remodel in-kind (55 sq. ft.), install dryer in closet, provide min 100 sq. inch opening, vent dryer to outside @ min 3' from property, and any building opening. | $10,000 |
| Dec 12, 2018 | Expired or cancelled cancelled Jan 2026 | 55 Hernandez Av | 1st fl - create 2 (n) bedrooms and 1 (n) bathroom; expand garage door to 10"-0'; build (n) open stair to connect to 2nd fl; 2nd fl - move kitchen to location of current bathroom; build 2 (n) bathrooms.Details
1st fl - create 2 (n) bedrooms and 1 (n) bathroom; expand garage door to 10"-0'; build (n) open stair to connect to 2nd fl; 2nd fl - move kitchen to location of current bathroom; build 2 (n) bathrooms. | $85,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2018 | 155 Lexington St | bathroom remodel. no changes to (e) floor plan.Details
bathroom remodel. no changes to (e) floor plan. | $5,000 |
| Nov 12, 2015 | Completed final sign-off Mar 2016 | 72 Littlefield Tr | remove non-bearing wall at closet & add toilet & shower to bathroom.Details
remove non-bearing wall at closet & add toilet & shower to bathroom. | $10,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2015 | 1819 45th Av | replace (1) bathroom in kind at second floor. replace (3) windows in existing light well, replace front windows in kind (wood sash, same configuration). replace front door. no other work at front. no plans.Details
replace (1) bathroom in kind at second floor. replace (3) windows in existing light well, replace front windows in kind (wood sash, same configuration). replace front door. no other work at front. no plans. | $20,000 |
| Jan 22, 2015 | Completed final sign-off Apr 2015 | 12 Littlefield Tr | remove non-bearing wall at closet and add bathroom with toilet & walk in steam shower.Details
remove non-bearing wall at closet and add bathroom with toilet & walk in steam shower. | $9,000 |
| Jul 17, 2014 | Completed final sign-off Dec 2014 | 76 Littlefield Tr | remove non-bearing wallt closet and add a new toilet and tub/shower to convert a new bathroom.Details
remove non-bearing wallt closet and add a new toilet and tub/shower to convert a new bathroom. | $7,000 |