Back to kitchen remodel contractors
Aotearoa Construction
- Based in
- San Franciso
- On San Francisco permits
- Apr 2006 to Mar 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 23 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2015 | Completed final sign-off Sep 2015 | 2211 Scott St | remodel kitchen & 2 bathrooms, replace 7 windows (in kind) on property line and rear of building. install new recessed lighting. no work visible from street or public right of way; maher n/aDetails
remodel kitchen & 2 bathrooms, replace 7 windows (in kind) on property line and rear of building. install new recessed lighting. no work visible from street or public right of way; maher n/a | $90,000 |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 447 Clipper St | remove an existing wall between kitchen and dinning roomDetails
remove an existing wall between kitchen and dinning room | $15,000 |
| Mar 27, 2012 | Completed final sign-off Nov 2012 | 1618 Great Hy | remove the extg partition between living and kitchen and replace with a new header.Details
remove the extg partition between living and kitchen and replace with a new header. | $4,000 |
| Mar 6, 2012 | Completed final sign-off Jun 2012 | 255 Eureka St | remodel (e) rear kitchen porch, repl window, add new door in (e) window width, new flring, update lighting & electrical in kind, repl (e) wood double hung window at kitchen, repair rot & water damage. no work visible from the street, no new habitable spaceDetails
remodel (e) rear kitchen porch, repl window, add new door in (e) window width, new flring, update lighting & electrical in kind, repl (e) wood double hung window at kitchen, repair rot & water damage. no work visible from the street, no new habitable space | $7,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 4152 23rd St | non structural demolition of an existing kitchen. remove all cabinetry, countertops & existing flooring & prepare for new existing gas & electrical to remain. no wall removal.Details
non structural demolition of an existing kitchen. remove all cabinetry, countertops & existing flooring & prepare for new existing gas & electrical to remain. no wall removal. | $1,000 |
| May 20, 2010 | Completed final sign-off Sep 2010 | 100 Devonshire Wy | remodel (e) kitchen. install 1-skylight in kitchen. install (n) pocket door in hall. install (n) lighting in living rm./dining rm. install (n) a.v. cabinet in living rm. no exterior work. all interior.Details
remodel (e) kitchen. install 1-skylight in kitchen. install (n) pocket door in hall. install (n) lighting in living rm./dining rm. install (n) a.v. cabinet in living rm. no exterior work. all interior. | $35,000 |
| Jul 21, 2008 | Completed final sign-off Sep 2008 | 110 08th Av | kitchen remodel- replace cabinets, re-stub out plumbing, new lighting, 50% of wattage to be fluorescent, no structural workDetails
kitchen remodel- replace cabinets, re-stub out plumbing, new lighting, 50% of wattage to be fluorescent, no structural work | $15,000 |
| Apr 12, 2006 | Completed final sign-off Aug 2006 | 2523 16th Av | remodel kitchen & breakfast room into 1 kitchen.Details
remodel kitchen & breakfast room into 1 kitchen. | $40,000 |