Ams Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Sep 2026
- Last 24 months
- 14 permits filed
63 permits since 2000: 44 completed, 8 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 2 completed, 1 in progress, 1 never finaled. Typically 721 days from filing to permit and 752 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| May 15, 2019 | Completed final sign-off May 2023 | 2815 Bush St | vertical addition - new 3rd floor addition with roof deck. consisting of 2 bedroom & 2 bathsDetails
vertical addition - new 3rd floor addition with roof deck. consisting of 2 bedroom & 2 baths | $175,000 |
| Aug 14, 2018 | Completed final sign-off Apr 2023 | 2643 31st Av | add 849sf on top of (e) roof & convert (e) 2-story into a 3-story bldg. add 266.7sf roof top deck in the front. add 75 sf cantilever balcony at the back.Details
add 849sf on top of (e) roof & convert (e) 2-story into a 3-story bldg. add 266.7sf roof top deck in the front. add 75 sf cantilever balcony at the back. | $150,000 |
| Jan 30, 2018 | Never finaled issued Nov 2019, no final | 2813 Bush St | horizontal rear yard addition. remodel 3rd flr master, 2 new bathrooms. remove shed roof & increase height @ at rear. extend kitchen @ 2nd flr. provide family rm w/ bath @ rear. 1st flr roof deck above. remove rear stairs @ deck.Details
horizontal rear yard addition. remodel 3rd flr master, 2 new bathrooms. remove shed roof & increase height @ at rear. extend kitchen @ 2nd flr. provide family rm w/ bath @ rear. 1st flr roof deck above. remove rear stairs @ deck. | $175,000 |