Back to bathroom remodel contractors
Ams Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Sep 2026
- Last 24 months
- 14 permits filed
63 permits since 2000: 44 completed, 8 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 15 completed, 4 in progress, 5 never finaled. Typically 2 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 20 Midcrest Wy | in-kind full kitchen and bathroom remodel. kitchen remodel includes: install hood, rewiring the electrical in the kitchen, add new recess lights, upgrade rough plumbing, draining, water lines, vents, gas line, install new cabinets, replace in 1 kind window above the sink, install new floors...Details
in-kind full kitchen and bathroom remodel. kitchen remodel includes: install hood, rewiring the electrical in the kitchen, add new recess lights, upgrade rough plumbing, draining, water lines, vents, gas line, install new cabinets, replace in 1 kind window above the sink, install new floors... | $32,850 |
| Jun 25, 2025 | Completed final sign-off Feb 2026 | 2114 40th Av | garage:add 231 sf of living space, reduce to 1 car garage, add 3rd bedroom & bonus rm & full bath, relocate laundry. 2nd/f: full kitchen & bathroom remodel. replace in-kind exterior & interior doors & windows. replace e) new 80k btu unit furnace, exterior siding replacement. re-roofingDetails
garage:add 231 sf of living space, reduce to 1 car garage, add 3rd bedroom & bonus rm & full bath, relocate laundry. 2nd/f: full kitchen & bathroom remodel. replace in-kind exterior & interior doors & windows. replace e) new 80k btu unit furnace, exterior siding replacement. re-roofing | $97,300 |
| Mar 6, 2025 | Completed final sign-off Aug 2025 | 104 Walnut St | in kind full bath remodel including shower pan and sauna room. electrical and plumbing upgrades,replacing stackable laundry machines at laundry room. install new light fixtures at multiple rooms, repair cracks, primer and paint on multiple rooms. no removal of wallsDetails
in kind full bath remodel including shower pan and sauna room. electrical and plumbing upgrades,replacing stackable laundry machines at laundry room. install new light fixtures at multiple rooms, repair cracks, primer and paint on multiple rooms. no removal of walls | $72,800 |
| Dec 4, 2024 | Completed final sign-off Aug 2026 | 1334 12th Av | rev. to pa 2021-0506-9906 s1 to replace 2 story hardy frame w story simpson strong tie moment frame. revise site plan to include several, low-height, rear yrd and front yrd ret. walls and conc. steps. revise basement floor plan to change previously shown storage to habitable space, bath, and wet barDetails
rev. to pa 2021-0506-9906 s1 to replace 2 story hardy frame w story simpson strong tie moment frame. revise site plan to include several, low-height, rear yrd and front yrd ret. walls and conc. steps. revise basement floor plan to change previously shown storage to habitable space, bath, and wet bar | $30,000 |
| Sep 24, 2024 | Completed final sign-off Nov 2025 | 631 43rd Av | to legalize (e) 844 secondary unit in the first floor - behind the (e) garage; to add 46 s.f.in order to enlarge the adu's kitchen and bathroom. per plan; to add 64 s.f.to create an independent entrance to the one bedroom, one bathroom, one complete kitchen. living and dining room adu.Details
to legalize (e) 844 secondary unit in the first floor - behind the (e) garage; to add 46 s.f.in order to enlarge the adu's kitchen and bathroom. per plan; to add 64 s.f.to create an independent entrance to the one bedroom, one bathroom, one complete kitchen. living and dining room adu. | $85,800 |
| Aug 5, 2024 | Completed final sign-off Aug 2024 | 20 Midcrest Wy | replace in kind bathroom vinly window. not street visible, no view c adjacent. replace minor dry rot with new framing for window (est 5'x5' max) exterior wall stucco repair. exterior tyvec waterproof, interior drywall repair around (n) windowDetails
replace in kind bathroom vinly window. not street visible, no view c adjacent. replace minor dry rot with new framing for window (est 5'x5' max) exterior wall stucco repair. exterior tyvec waterproof, interior drywall repair around (n) window | $8,360 |
| Jul 22, 2024 | In progress issued Aug 2024 | 615 Waller St | interior remodeling in the 2nd story of unit #615 to include a complete bathroom 30 sf affected.Details
interior remodeling in the 2nd story of unit #615 to include a complete bathroom 30 sf affected. | $22,700 |
| Jul 18, 2024 | Completed final sign-off Aug 2024 | 1145 Munich St | in kind bath remodel upgrade rough electrical plumbing shower pan, new fixtures and bath accesoriesDetails
in kind bath remodel upgrade rough electrical plumbing shower pan, new fixtures and bath accesories | $18,200 |
| Jun 6, 2024 | Completed final sign-off Nov 2024 | 257 Richland Av | 2nd story bathroom remodel (n) configuration 62 sqft affectedDetails
2nd story bathroom remodel (n) configuration 62 sqft affected | $21,000 |
| May 31, 2024 | In progress issued Jun 2024 | 615 Waller St | comply with complaint#2024001412enf. notice of enforcment.work to includes to repair sheet rock and remodell kitchen and bathroom.Details
comply with complaint#2024001412enf. notice of enforcment.work to includes to repair sheet rock and remodell kitchen and bathroom. | $10,000 |
| Sep 21, 2023 | Never finaled filed Sep 2023, never issued | 2813 Bush St | revision to pa# 201801309887. reduce scope of work - interior remodel of 3/f. roof above current laudnry room to be demolished on new gable roof to aligh with existing roof. remodel master bath on 3/fDetails
revision to pa# 201801309887. reduce scope of work - interior remodel of 3/f. roof above current laudnry room to be demolished on new gable roof to aligh with existing roof. remodel master bath on 3/f | $180,000 |
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| Aug 12, 2021 | Completed final sign-off Jan 2022 | 373 Lombard St | unit 302: in kind kitchen remodel, 2 bathrooms remodel, upgrade sub panel remove and replace in kind. aluminum insert windows (street facing), install new flooring, paint interior unit.Details
unit 302: in kind kitchen remodel, 2 bathrooms remodel, upgrade sub panel remove and replace in kind. aluminum insert windows (street facing), install new flooring, paint interior unit. | $71,300 |
| Aug 12, 2021 | Completed final sign-off Nov 2021 | 46 Sharon St | in kind bath remodel. add exhaust fan (2) recess lights, shower pan build. 1 toilet , 1 vanity/sinkDetails
in kind bath remodel. add exhaust fan (2) recess lights, shower pan build. 1 toilet , 1 vanity/sink | $31,400 |
| Aug 12, 2021 | Never finaled issued Aug 2021, no final | 89 Woodhaven Ct | add a wall in ground floor to create a family room, a full bath, shower pan. extend stairs landing. replace 2 windows in ground floor.Details
add a wall in ground floor to create a family room, a full bath, shower pan. extend stairs landing. replace 2 windows in ground floor. | $49,200 |
| Jul 2, 2021 | Completed final sign-off Apr 2026 | 454 Elizabeth St | add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decksDetails
add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decks | $200,000 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 8 Sharon St | bathroom remodel in-kind. new exhaust fan. rewiring. upgrade plumbing. install new plumbing fixtures: tub, sink, toilet. re-tile shower walls, floor, water closet. no change of layout.Details
bathroom remodel in-kind. new exhaust fan. rewiring. upgrade plumbing. install new plumbing fixtures: tub, sink, toilet. re-tile shower walls, floor, water closet. no change of layout. | $27,800 |
| Dec 23, 2019 | Completed final sign-off Jun 2020 | 307 Chenery St | add storage room, bath, closet at garage area. replace e south foundationDetails
add storage room, bath, closet at garage area. replace e south foundation | $38,000 |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 340 Ritch St | #2 full bath addition at main floor no exterior/structural workDetails
#2 full bath addition at main floor no exterior/structural work | $19,000 |
| May 15, 2019 | Completed final sign-off May 2023 | 2815 Bush St | vertical addition - new 3rd floor addition with roof deck. consisting of 2 bedroom & 2 bathsDetails
vertical addition - new 3rd floor addition with roof deck. consisting of 2 bedroom & 2 baths | $175,000 |
| Mar 4, 2019 | Never finaled filed Mar 2019, never issued | 2715 Yorba St | conversion of garage to adu per ord# 95-17 and rear addition to enclose (e) 2nd flr expansion. build new kitchen, bathroom and bedroom @ ground flr.Details
conversion of garage to adu per ord# 95-17 and rear addition to enclose (e) 2nd flr expansion. build new kitchen, bathroom and bedroom @ ground flr. | $40,000 |
| Dec 18, 2018 | Completed final sign-off May 2019 | 990 Duncan St | remodel bathroom in kind. replace shower valve, retile shower wall and floor. replace lighting fixture and exhaust fan.Details
remodel bathroom in kind. replace shower valve, retile shower wall and floor. replace lighting fixture and exhaust fan. | $8,500 |
| Aug 20, 2018 | Never finaled issued Dec 2018, no final | 1012 Chenery St | 1st fl - build a family room, on the ground floor with new 1/2 bath; 2nd fl - rebuild (e) stair & renovate kitchen, new 1/2 bath; 3rd fl - renovate master closet & officeDetails
1st fl - build a family room, on the ground floor with new 1/2 bath; 2nd fl - rebuild (e) stair & renovate kitchen, new 1/2 bath; 3rd fl - renovate master closet & office | $78,585 |
| Jan 30, 2018 | Never finaled issued Nov 2019, no final | 2813 Bush St | horizontal rear yard addition. remodel 3rd flr master, 2 new bathrooms. remove shed roof & increase height @ at rear. extend kitchen @ 2nd flr. provide family rm w/ bath @ rear. 1st flr roof deck above. remove rear stairs @ deck.Details
horizontal rear yard addition. remodel 3rd flr master, 2 new bathrooms. remove shed roof & increase height @ at rear. extend kitchen @ 2nd flr. provide family rm w/ bath @ rear. 1st flr roof deck above. remove rear stairs @ deck. | $175,000 |