Amn Construction
- Based in
- Santa Barbara
- On San Francisco permits
- Sep 2013 to Feb 2025
- Last 24 months
- 2 permits filed
44 permits since 2000: 34 completed, 1 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 expired or cancelled. Typically 536 days from filing to permit and 806 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2019 | Expired or cancelled cancelled Feb 2023 | 196 Avila St | vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair.Details
vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair. | $893,000 |
| Aug 20, 2015 | Completed final sign-off Nov 2018 | 823 Lake St | add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroomDetails
add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroom | $1,000,000 |
| Nov 17, 2014 | Completed final sign-off Aug 2017 | 196 Avila St | replace (e) wood fence at rear yard with 8'-0" high property line stucco fence, replace (e) 4'-0" dia spiral stair to (e) roof deck with (n) 5'-0" dia spiral stair, (n) 270 sq.ft. roof deck expansion to (e) roof deck, minor window & door modifications, missc interior partition changes per plan, kitDetails
replace (e) wood fence at rear yard with 8'-0" high property line stucco fence, replace (e) 4'-0" dia spiral stair to (e) roof deck with (n) 5'-0" dia spiral stair, (n) 270 sq.ft. roof deck expansion to (e) roof deck, minor window & door modifications, missc interior partition changes per plan, kit | $270,000 |
| Apr 28, 2014 | Completed final sign-off Apr 2018 | 2253 Clay St | remove(e)storage struct, stair & deck @ rear yard. convert(e)243 sq ft unconditioned space at mech/storage into conditioned bedrm suite &(n) stair to 2nd fl dwelling unit. (n)322 sq ft infill addition under(e) bedrm @ rear yard. (n)roof deck above infill addition w/ non-req'd exit spiral stair @ reaDetails
remove(e)storage struct, stair & deck @ rear yard. convert(e)243 sq ft unconditioned space at mech/storage into conditioned bedrm suite &(n) stair to 2nd fl dwelling unit. (n)322 sq ft infill addition under(e) bedrm @ rear yard. (n)roof deck above infill addition w/ non-req'd exit spiral stair @ rea | $95,000 |