Back to bathroom remodel contractors
Amn Construction
- Based in
- Santa Barbara
- On San Francisco permits
- Sep 2013 to Feb 2025
- Last 24 months
- 2 permits filed
44 permits since 2000: 34 completed, 1 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 14 completed, 1 in progress, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2025 | In progress issued Feb 2025 | 1483 Sutter St | remodel kitchen and 2 baths in kind. replace enterior doors in kind. no exterior workDetails
remodel kitchen and 2 baths in kind. replace enterior doors in kind. no exterior work | $100,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2024 | 184 Avila St | revision to pa# 2021-0204-4022: 2nf fl. lightwell infill at unit 1 (184 avila st) reconfigure bath. ref pa# 2021-0128-3536Details
revision to pa# 2021-0204-4022: 2nf fl. lightwell infill at unit 1 (184 avila st) reconfigure bath. ref pa# 2021-0128-3536 | |
| Feb 26, 2021 | Completed final sign-off Jul 2022 | 3230 Broderick St | kitchen and bath remodel, replace several windows,convert storage to bath and garden room; new stair to ground from lower unit; relocate kitchen, add bath to upper unit.Details
kitchen and bath remodel, replace several windows,convert storage to bath and garden room; new stair to ground from lower unit; relocate kitchen, add bath to upper unit. | $20,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2024 | 184 Avila St | interior remodel to upper level & seismic upgrade bldg to include (n) ensuite main bath at south main bedroom.remodel kitchen to open to front dining and living room. provide (n) 1/2 bath, reconfigure bath #2 at north. adu under pa202101283536.Details
interior remodel to upper level & seismic upgrade bldg to include (n) ensuite main bath at south main bedroom.remodel kitchen to open to front dining and living room. provide (n) 1/2 bath, reconfigure bath #2 at north. adu under pa202101283536. | $521,000 |
| Jan 27, 2021 | Completed final sign-off Jul 2022 | 3230 Broderick St | lower unit: replace 1 kitchen, 1 bathroom in kind.Details
lower unit: replace 1 kitchen, 1 bathroom in kind. | $30,000 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 2642 17th Av | bathroom remodel (new tub, vanity, sinks, toilets, tile, fixtures) no walls walls moved, no structural workDetails
bathroom remodel (new tub, vanity, sinks, toilets, tile, fixtures) no walls walls moved, no structural work | $30,000 |
| Sep 23, 2020 | Completed final sign-off Jun 2024 | 184 Avila St | remove & replace fixtures and finishes (2 baths and 1 kitchen) on 2nd fl. exploratory demolition.Details
remove & replace fixtures and finishes (2 baths and 1 kitchen) on 2nd fl. exploratory demolition. | $80,000 |
| Jan 30, 2020 | Never finaled issued Feb 2020, no final | 2770 19th Av | add structural work to 201911147253 open wall at kitchen and master bathDetails
add structural work to 201911147253 open wall at kitchen and master bath | $150,000 |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 2770 19th Av | unit 58. bathroom remodel. replace all fixtures in-kindDetails
unit 58. bathroom remodel. replace all fixtures in-kind | $30,000 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 2770 19th Av | remodel (2) bathrooms, 140 sq ft, and (1) kitchen, 100 sq ft. no alteration of walls.Details
remodel (2) bathrooms, 140 sq ft, and (1) kitchen, 100 sq ft. no alteration of walls. | $60,000 |
| Aug 19, 2019 | Expired or cancelled cancelled Nov 2019 | 2736 Fulton St | replace two bathrooms on 2nd and 3rd floor in kind same locationDetails
replace two bathrooms on 2nd and 3rd floor in kind same location | $40,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Feb 2023 | 196 Avila St | vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair.Details
vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair. | $893,000 |
| May 3, 2019 | Completed final sign-off Dec 2019 | 2746 Gough St | unit #1 - change cabinets and fixture in 2 baths and 1 kitchen. (e) remains in same place in kind. no change of (e) floor planDetails
unit #1 - change cabinets and fixture in 2 baths and 1 kitchen. (e) remains in same place in kind. no change of (e) floor plan | $60,000 |
| Nov 30, 2017 | Completed final sign-off Nov 2018 | 1133 Greenwich St | remodel existing kitchen at 2nd flr including cabinets and new lighting. remodel bathrooms on 3rd and 4th flrs. maher naDetails
remodel existing kitchen at 2nd flr including cabinets and new lighting. remodel bathrooms on 3rd and 4th flrs. maher na | $30,000 |
| Feb 22, 2016 | Completed final sign-off Aug 2016 | 2080 14th Av | remodel bath; update lighting to current code; exhaust fan, replacing skylight. u factor not > .4Details
remodel bath; update lighting to current code; exhaust fan, replacing skylight. u factor not > .4 | $25,000 |
| Dec 14, 2015 | Completed final sign-off Jul 2016 | 2990 Clay St | unit 4, remodel (e) kitchen & 2 bathrooms. vault living room ceiling & relocate an (e) skyklight. provide new interior door to (e) den & a "bar niche"/counterspace in dining area. new fixtrues & finishes throughougDetails
unit 4, remodel (e) kitchen & 2 bathrooms. vault living room ceiling & relocate an (e) skyklight. provide new interior door to (e) den & a "bar niche"/counterspace in dining area. new fixtrues & finishes throughoug | $60,000 |
| Aug 20, 2015 | Completed final sign-off Nov 2018 | 823 Lake St | add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroomDetails
add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroom | $1,000,000 |
| Nov 21, 2014 | Completed final sign-off Jun 2015 | 2002 Pacific Av | remodel bathroom - no alteration of wall, window; winden existing door in non bearing wallDetails
remodel bathroom - no alteration of wall, window; winden existing door in non bearing wall | $5,000 |
| Oct 3, 2014 | Never finaled issued Oct 2014, no final | 2770 19th Av | unit #48: interior remodel. 1 kitchen and 2 bathrooms.Details
unit #48: interior remodel. 1 kitchen and 2 bathrooms. | $60,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2015 | 2746 Gough St | unit 2: remove kitchen cabinets & countertops, carpet & floor tile, one bathroom, replace all, lighting work to comply with cec 150(k)8 & 150 (k)10 respectively.Details
unit 2: remove kitchen cabinets & countertops, carpet & floor tile, one bathroom, replace all, lighting work to comply with cec 150(k)8 & 150 (k)10 respectively. | $40,000 |
| Oct 28, 2013 | Completed final sign-off May 2014 | 2255 Clay St | remove and replace tile, tub, shower pan, add bathroom fan vent to outside min 3' rpn,no lighting changesDetails
remove and replace tile, tub, shower pan, add bathroom fan vent to outside min 3' rpn,no lighting changes | $10,000 |