Permit GraphShortlistSan Francisco building permits since 2000

Alvarado Structural Steel

Contractor license
1075347
State license record
Based in
Daly City
On San Francisco permits
Jun 2018 to Dec 2025
Last 24 months
5 permits filed

6 permits since 2000: 4 completed, 1 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 3 to 5 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 2Kitchen remodel 2Bathroom remodel 2

2 stairs permits: 2 completed. Typically 12 days from filing to permit and 262 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 2, 2025Completed
final sign-off Apr 2026
184 Graystone Trreplace stone and tile only (no structural in kind) on 32 steps and 3 landings at front entrance staircase. re-paint the entire front facade.
Details
Permit
202512020737
Status
complete
Filed
Dec 2, 2025
Permit issued
Dec 2, 2025
Final sign-off
Apr 14, 2026
Declared cost
$30,000
Address
184 Graystone Tr

replace stone and tile only (no structural in kind) on 32 steps and 3 landings at front entrance staircase. re-paint the entire front facade.

Open the permit page

$30,000
Oct 21, 2024Completed
final sign-off Dec 2025
2224 Lawton St2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation.
Details
Permit
202410213357
Status
complete
Filed
Oct 21, 2024
Permit issued
Nov 13, 2024
Final sign-off
Dec 9, 2025
Declared cost
$160,000
Address
2224 Lawton St

2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation.

Open the permit page

$160,000