Back to kitchen remodel contractors
Alvarado Structural Steel
- Based in
- Daly City
- On San Francisco permits
- Jun 2018 to Dec 2025
- Last 24 months
- 5 permits filed
6 permits since 2000: 4 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 12 days from filing to permit and 391 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2025 | In progress issued Nov 2025 | 144 Lakeview Av | replace 200 sf of drywall in 2 bathrooms and kitchen. no framing.Details
replace 200 sf of drywall in 2 bathrooms and kitchen. no framing. | $20,000 |
| Oct 21, 2024 | Completed final sign-off Dec 2025 | 2224 Lawton St | 2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation.Details
2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation. | $160,000 |