Back to kitchen remodel contractors
Alum Rock Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2023 to Oct 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 37 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off May 2026 | 2771 37th Av | 2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodelDetails
2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodel | $95,000 |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 1936 Great Hy | remove and demo old cabinets and countertops. replace sinks and stove and outlets. hood replacement, floor/tile replacement. drywall repairs as needed. all work at one kitchen on 2nd floor.Details
remove and demo old cabinets and countertops. replace sinks and stove and outlets. hood replacement, floor/tile replacement. drywall repairs as needed. all work at one kitchen on 2nd floor. | $40,000 |