Back to bathroom remodel contractors
Alum Rock Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2023 to Oct 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 74 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off May 2026 | 2771 37th Av | 2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodelDetails
2-story single family home interior remodel including a lower level bedroom, remodel with closet and bathroom addition. a separated bonus room includes enlarged openings to a remodeled rear deck. upper interior improvements include a bathroom remodel , half bathroom addition and kitchen remodel | $95,000 |
| Nov 26, 2024 | Completed final sign-off Aug 2025 | 1776 Sacramento St | unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatmentDetails
unit 704- proposed interor remodel of the top floor corner condo in an (e) 7 story mixed use buliding. (n) millwork, light fixtures, and w&d. extended main closet and remodeled bathrooms. (n) buffet sink and (n) window treatment | $70,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 739 Shrader St | bathroom remodel, replace tile, shower, vanity, and toiletDetails
bathroom remodel, replace tile, shower, vanity, and toilet | $6,500 |