Back to kitchen remodel contractors
Alpha-Winfield Constructor Inc. Dba Winf
- Based in
- Emeryville
- On San Francisco permits
- Aug 2001 to Dec 2021
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 3 never finaled. Typically 10 days from filing to permit and 493 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 580 Bush St | revision to pa #201704123852, #201908279990 and #202109108193. revision to commercial kitchen & bathroom layout.Details
revision to pa #201704123852, #201908279990 and #202109108193. revision to commercial kitchen & bathroom layout. | |
| Sep 10, 2021 | Never finaled issued Sep 2021, no final | 580 Bush St | revision to approved bpa# 201908279990. install/trench for sewer line and floor drawins for kitchen, bar, and batrhooms.Details
revision to approved bpa# 201908279990. install/trench for sewer line and floor drawins for kitchen, bar, and batrhooms. | $5,000 |
| Sep 24, 2020 | Never finaled issued Sep 2020, no final | 429 Ashbury St | water damage restoration. no exterior work. damage report state farm #05-0329-34. damage to kitchen ceiling & wall (pantry). install insulation as needed. replace sheetrock. detach & reset recess lights. upstair bathw/c lead band remove/replace.Details
water damage restoration. no exterior work. damage report state farm #05-0329-34. damage to kitchen ceiling & wall (pantry). install insulation as needed. replace sheetrock. detach & reset recess lights. upstair bathw/c lead band remove/replace. | $40,000 |
| Aug 27, 2019 | Completed final sign-off May 2022 | 580 Bush St | revise 201704123852: int remodel (e) commercial space.build (n) commercial kitchen & accessible baths.(n)2 hr rated type 1 exhaust shaft w/ cleanouts & rooftop mech equip. remodel res units sep permit.(e) stair to (e) mezz remain, cnvert portion mezz to dinDetails
revise 201704123852: int remodel (e) commercial space.build (n) commercial kitchen & accessible baths.(n)2 hr rated type 1 exhaust shaft w/ cleanouts & rooftop mech equip. remodel res units sep permit.(e) stair to (e) mezz remain, cnvert portion mezz to din | $15,000 |
| Sep 7, 2018 | Never finaled filed Sep 2018, never issued | 429 Ashbury St | kitchen remodel, replaced windows at rear, cosmetic remodel at kitchen, [raised roofing framing to make ceiling match existing] this portion of work in revision 1) in revision to 201807053795Details
kitchen remodel, replaced windows at rear, cosmetic remodel at kitchen, [raised roofing framing to make ceiling match existing] this portion of work in revision 1) in revision to 201807053795 | |
| May 8, 2018 | Completed final sign-off Oct 2019 | 14 Montezuma St | kitchen and bathroom remodel, removal of wall and installation of new aluminum glass sliding door to exteriorDetails
kitchen and bathroom remodel, removal of wall and installation of new aluminum glass sliding door to exterior | $225,000 |
| Dec 12, 2013 | Completed final sign-off Jun 2015 | 2170 Jackson St | unit #5: interior remodel, remodel of exist master bath, kitchen relocation to upper floor, new staircaseDetails
unit #5: interior remodel, remodel of exist master bath, kitchen relocation to upper floor, new staircase | $295,000 |
| Aug 21, 2001 | Completed final sign-off Nov 2001 | 355 Buena Vista East Av | kitchen remodel as per drawking replacing cabs & counter tops, all kitchenDetails
kitchen remodel as per drawking replacing cabs & counter tops, all kitchen | $32,000 |