Back to bathroom remodel contractors
Alpha-Winfield Constructor Inc. Dba Winf
- Based in
- Emeryville
- On San Francisco permits
- Aug 2001 to Dec 2021
- Last 24 months
- 0 permits filed
24 permits since 2000: 20 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 28 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2021 | Completed final sign-off Sep 2022 | 580 Bush St | revision to pa #201704123852, #201908279990 and #202109108193. revision to commercial kitchen & bathroom layout.Details
revision to pa #201704123852, #201908279990 and #202109108193. revision to commercial kitchen & bathroom layout. | |
| Aug 27, 2019 | Completed final sign-off May 2022 | 580 Bush St | revise 201704123852: int remodel (e) commercial space.build (n) commercial kitchen & accessible baths.(n)2 hr rated type 1 exhaust shaft w/ cleanouts & rooftop mech equip. remodel res units sep permit.(e) stair to (e) mezz remain, cnvert portion mezz to dinDetails
revise 201704123852: int remodel (e) commercial space.build (n) commercial kitchen & accessible baths.(n)2 hr rated type 1 exhaust shaft w/ cleanouts & rooftop mech equip. remodel res units sep permit.(e) stair to (e) mezz remain, cnvert portion mezz to din | $15,000 |
| May 8, 2018 | Completed final sign-off Oct 2019 | 14 Montezuma St | kitchen and bathroom remodel, removal of wall and installation of new aluminum glass sliding door to exteriorDetails
kitchen and bathroom remodel, removal of wall and installation of new aluminum glass sliding door to exterior | $225,000 |
| Nov 10, 2015 | Completed final sign-off Mar 2016 | 1261 Noe St | upper unit -front bedroom prep closet for new 1/2 bath, remove cabinet & sheet rock/re-sheetrock, after other trades are completed. electrical & plumber will pull their own permits.Details
upper unit -front bedroom prep closet for new 1/2 bath, remove cabinet & sheet rock/re-sheetrock, after other trades are completed. electrical & plumber will pull their own permits. | $2,500 |
| Jan 13, 2015 | Completed final sign-off Jun 2015 | 2170 Jackson St | fill in existing concrete door opening that connects existing outdoor courtyard to roof. remove free standing ladder from roof. per fire inspector's request provide egress diagram at 6th floor, 5th floor, and roof. revise master bathroom layout approved under pa#2014-0213-8511. n/a ordinance #155-13Details
fill in existing concrete door opening that connects existing outdoor courtyard to roof. remove free standing ladder from roof. per fire inspector's request provide egress diagram at 6th floor, 5th floor, and roof. revise master bathroom layout approved under pa#2014-0213-8511. n/a ordinance #155-13 | $400 |
| Dec 12, 2013 | Completed final sign-off Jun 2015 | 2170 Jackson St | unit #5: interior remodel, remodel of exist master bath, kitchen relocation to upper floor, new staircaseDetails
unit #5: interior remodel, remodel of exist master bath, kitchen relocation to upper floor, new staircase | $295,000 |