Back to kitchen remodel contractors
Almega Building
- Based in
- Fremont
- On San Francisco permits
- Jun 2021 to Sep 2026
- Last 24 months
- 1 permit filed
6 permits since 2000: 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2022 | Completed final sign-off Jan 2023 | 67 Joost Av | to comply w/ nov #202290708. interior remodel relocation of non-structural walls, (n) plumbing add (1) toilet (1) sink (1) shower. (n) electrical, fixtures finishes, appliances. duplex 2nd fl unit 67 only living, kitchen (3) bedrm (2) bath (1-new). replace windows at rear, exterior unchanged.Details
to comply w/ nov #202290708. interior remodel relocation of non-structural walls, (n) plumbing add (1) toilet (1) sink (1) shower. (n) electrical, fixtures finishes, appliances. duplex 2nd fl unit 67 only living, kitchen (3) bedrm (2) bath (1-new). replace windows at rear, exterior unchanged. | $35,000 |