Almega Building
- Based in
- Fremont
- On San Francisco permits
- Jun 2021 to Sep 2026
- Last 24 months
- 1 permit filed
6 permits since 2000: 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 in progress, 1 expired or cancelled. Typically 305 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 65 Joost Av | no work in existing building . add/construct 2 level deck for multi-resident home. add 2 entry doors, at (e) previously permitted headers and framing centered in interior hallway.Details
no work in existing building . add/construct 2 level deck for multi-resident home. add 2 entry doors, at (e) previously permitted headers and framing centered in interior hallway. | $35,000 |
| Dec 8, 2023 | Expired or cancelled expired Feb 2026 | 65 Joost Av | no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches.Details
no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches. | $35,000 |