Almac Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to May 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 21 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 2 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2015 | Expired or cancelled withdrawn Jun 2016 | 3225 20th St | replace (e) exterior entry stairway, garage door & 3 front facing windows. replace side entrance door.Details
replace (e) exterior entry stairway, garage door & 3 front facing windows. replace side entrance door. | $25,000 |
| Mar 5, 2010 | Completed final sign-off Jun 2011 | 14 Washburn St | repairs to fire damage at northeast corner of building that includes siding, gyp. bd. and window replacement and rebuild stairs. also minor repair to (e) rear stairs.Details
repairs to fire damage at northeast corner of building that includes siding, gyp. bd. and window replacement and rebuild stairs. also minor repair to (e) rear stairs. | $25,000 |
| Nov 5, 2009 | Completed final sign-off Feb 2010 | 2108 Bryant St | replace existing rear stairs in kind more than 50% . reduced 2nd means of egress.Details
replace existing rear stairs in kind more than 50% . reduced 2nd means of egress. | $17,000 |
| Jan 15, 2009 | Expired or cancelled cancelled Jan 2026 | 2108 Bryant St | replace/repair existing rear stairs in kind.more than 50%, reduced 2nd means of egress.Details
replace/repair existing rear stairs in kind.more than 50%, reduced 2nd means of egress. | $17,000 |
| Dec 14, 2007 | Never finaled issued Dec 2007, no final | 640 Laguna St | repair ground floor stairs. 3 steps (at back) less than 50%.Details
repair ground floor stairs. 3 steps (at back) less than 50%. | $500 |