Back to kitchen remodel contractors
Almac Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to May 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 21 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 in progress. Typically 36 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 26, 2026 | In progress issued Aug 2026 | 2156 Bryant St | proposed interior renovation of an existing upper unit in a 2-unit apartment. work includes - moving kitchen, removal bathroom and adding 4 skylights. removal of chimney & firebox. infill floor & roof. revision to 202604159516Details
proposed interior renovation of an existing upper unit in a 2-unit apartment. work includes - moving kitchen, removal bathroom and adding 4 skylights. removal of chimney & firebox. infill floor & roof. revision to 202604159516 | $30,000 |
| Oct 4, 2013 | Completed final sign-off May 2021 | 2635 18th St | shoring & underpinning (e) foundation to allow for (n) footings & (n) slab on grade w/ 8'6" ceiling heights. removal of (e) dry rot. addition of 507 sq ft c (e) basement (n) level 1, 265 sq ft @ (n) kitchen levl 2, & 303 sq ft at (n) mastbedrm & bath level 3.Details
shoring & underpinning (e) foundation to allow for (n) footings & (n) slab on grade w/ 8'6" ceiling heights. removal of (e) dry rot. addition of 507 sq ft c (e) basement (n) level 1, 265 sq ft @ (n) kitchen levl 2, & 303 sq ft at (n) mastbedrm & bath level 3. | $150,000 |
| Nov 9, 2010 | Completed final sign-off Jun 2011 | 16 Washburn St | unit #14: replace kitchen cabinets & countertops. unit #16: replace kitchen cabinets & countertops.Details
unit #14: replace kitchen cabinets & countertops. unit #16: replace kitchen cabinets & countertops. | $10,000 |
| May 21, 2010 | Completed final sign-off Aug 2010 | 400 Cole St | all work to be done in unit #404-remodel (e) kitchen with new cabinets, counter tops, flooring, relocate plumbing fixtures in lower bathroom, replace window in kind, install new tub, vanity in upper bathroom. no moving or adding wallsDetails
all work to be done in unit #404-remodel (e) kitchen with new cabinets, counter tops, flooring, relocate plumbing fixtures in lower bathroom, replace window in kind, install new tub, vanity in upper bathroom. no moving or adding walls | $45,000 |