Allied Teamwork Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Aug 2026
- Last 24 months
- 4 permits filed
166 permits since 2000: 141 completed, 2 in progress, 13 never finaled, 10 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 6 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 20 days from filing to permit and 233 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2023 | Expired or cancelled expired Apr 2026 | 4 Wright St | to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl.Details
to comply with nov# 202313476. rebuild front entry stair in-kind. modify & strengthen rear stair stringers. add stair from 1st to 2nd fl. rebuild stair from 2nd to 3rd fl. | $15,000 |
| Mar 24, 2022 | In progress issued Sep 2024 | 2559 44th Av | new 2-story rear yard addition to (e) 2-story single family dwelling. 1/f: new bedroom, living room, 2 bathrooms, office and media room. 2/f: new bedroom, office & bathroom. new roof deck & spiral staircase at rear.Details
new 2-story rear yard addition to (e) 2-story single family dwelling. 1/f: new bedroom, living room, 2 bathrooms, office and media room. 2/f: new bedroom, office & bathroom. new roof deck & spiral staircase at rear. | $150,000 |
| Feb 26, 2020 | Never finaled issued Feb 2020, no final | 3038 Jackson St | replace existing masonry stair with p.t. hd framing. less than 50% replacement, all in kind. partial repair of entry stair front.Details
replace existing masonry stair with p.t. hd framing. less than 50% replacement, all in kind. partial repair of entry stair front. | $7,000 |
| Dec 26, 2019 | Completed final sign-off Jul 2024 | 2339 38th Av | interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair.Details
interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair. | $150,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 1859 26th Av | remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height.Details
remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height. | $48,000 |
| Oct 21, 2015 | Completed final sign-off Oct 2016 | 305 Nevada St | 1st fl: remove 2 extg bedroom at rear. legalize 2 bedroom , 1 and 1/2 bath rm, game rm. upgrade elect/plmg. relocate interior stair. add nw steps up to street level. nw laundryroom, replace old window, strengthening extg foundation. 2nd fl: remodel extg kitchen, relocate exgt bathroom.Details
1st fl: remove 2 extg bedroom at rear. legalize 2 bedroom , 1 and 1/2 bath rm, game rm. upgrade elect/plmg. relocate interior stair. add nw steps up to street level. nw laundryroom, replace old window, strengthening extg foundation. 2nd fl: remodel extg kitchen, relocate exgt bathroom. | $150,000 |
| Aug 24, 2015 | Completed final sign-off Feb 2023 | 1287 05th Av | add 2 bedrooms, 1 full bath on 1st fl per plan. add ainterior stair per plan. kitchen and bath remodel on 2nd fl per planDetails
add 2 bedrooms, 1 full bath on 1st fl per plan. add ainterior stair per plan. kitchen and bath remodel on 2nd fl per plan | $40,000 |
| Oct 7, 2011 | Completed final sign-off Jan 2012 | 1908 Lake St | work at 1908 lake st. only: repair (e) wood staircase in the rear backyard, replace dry rot and damaged wood planks with pressure treated wood. (less than 50% repair).Details
work at 1908 lake st. only: repair (e) wood staircase in the rear backyard, replace dry rot and damaged wood planks with pressure treated wood. (less than 50% repair). | $5,000 |
| Jun 18, 2008 | Completed final sign-off Oct 2008 | 1650 Quint St | ground floor remodel: convert garage space to add play room, office & bedroom & full bath. and add rear stairs.Details
ground floor remodel: convert garage space to add play room, office & bedroom & full bath. and add rear stairs. | $40,000 |