Allied Teamwork Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2006 to Aug 2026
- Last 24 months
- 4 permits filed
166 permits since 2000: 141 completed, 2 in progress, 13 never finaled, 10 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 64 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2021 | Completed final sign-off Oct 2021 | 10 Bronte St | remodel 1st floor space to new bedroom, bathroom, walk-in & laundry. 2nd floor remodel kitchen & bathroom. new rear deck on 2nd levelDetails
remodel 1st floor space to new bedroom, bathroom, walk-in & laundry. 2nd floor remodel kitchen & bathroom. new rear deck on 2nd level | $98,000 |
| Dec 26, 2019 | Completed final sign-off Jul 2024 | 2339 38th Av | interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair.Details
interior remodel for both floors, remodel (e) kitchen, bathroom bedroom @ 2nd fl. new media, laundry,baths & bedroom @ 1st floor. rear 2nd story horizontal addition for new mater suite with rook deck & stair. | $150,000 |
| Sep 10, 2019 | Completed final sign-off Jun 2025 | 278 Howth St | add a horizontal addtion to the rear of an (e) dwelling. the addition will include a new bedroom & bathroom on the 1st fl. the 2nd fl will have a new family room & bathroom. the 3rd fl will have a new study & bathroom. new decks @ rearDetails
add a horizontal addtion to the rear of an (e) dwelling. the addition will include a new bedroom & bathroom on the 1st fl. the 2nd fl will have a new family room & bathroom. the 3rd fl will have a new study & bathroom. new decks @ rear | $185,000 |
| Nov 28, 2017 | Completed final sign-off Jul 2019 | 2007 30th Av | at 1st fl, new bedroom, bath, family, laundry and new entry 2nd fl. remodel e kitchen bath, bedrooms, 1 new bath. 1 new 1 level wood deck. infill lighttwell and replace e front and rear windowsDetails
at 1st fl, new bedroom, bath, family, laundry and new entry 2nd fl. remodel e kitchen bath, bedrooms, 1 new bath. 1 new 1 level wood deck. infill lighttwell and replace e front and rear windows | $80,000 |
| Dec 9, 2016 | Completed final sign-off Apr 2017 | 1859 26th Av | remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height.Details
remodel (e) kitchen, bathroom, remove/replace cabinets, counter & fixtures at 2/f, convert (e) family room to 2 bedroom & 1 bathroom to 2 bathrooms at g/f, construct staircase to (e) deck at rear of deck, less than 10' height. | $48,000 |
| Jul 1, 2013 | Completed final sign-off Jul 2013 | 1743 San Jose Av | to comply with complaint # 201303131, repair rear wood deck railing , steps less than 50% in kind.Details
to comply with complaint # 201303131, repair rear wood deck railing , steps less than 50% in kind. | $1,000 |