Back to kitchen remodel contractors
All Food Service Installations
- Based in
- Emeryville
- On San Francisco permits
- Dec 2009 to Jun 2019
- Last 24 months
- 0 permits filed
27 permits since 2000: 19 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 2 never finaled. Typically 158 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2017 | Completed final sign-off Sep 2018 | 1661 Tennessee St | 2/f. unit 3b. -ti change of use for new catering kitchen, 2 class 1 hoods, equipment, sinks maher not req. hood suppression systems deferred.Details
2/f. unit 3b. -ti change of use for new catering kitchen, 2 class 1 hoods, equipment, sinks maher not req. hood suppression systems deferred. | $95,000 |
| Jan 19, 2017 | Never finaled issued Apr 2017, no final | 235 Church St | remodeling restaurant installation two exhaust hoods and associated cooking equipment, sink, kitchen walk-in. ansul & sprinkler deferred.Details
remodeling restaurant installation two exhaust hoods and associated cooking equipment, sink, kitchen walk-in. ansul & sprinkler deferred. | $25,000 |
| Sep 19, 2016 | Completed final sign-off Jan 2020 | 4791 Mission St | interior t.i.: ada restroom, non structural partitions, counter, sinks, kitchen with hood and cooking equipment.Details
interior t.i.: ada restroom, non structural partitions, counter, sinks, kitchen with hood and cooking equipment. | $40,000 |
| Aug 29, 2013 | Completed final sign-off Aug 2016 | 4404 03rd St | rev. of pa#201211083838 with use of 2 kitchen hoods instead of 1. the use of 2 make up air units and the use of 2 exhaust fans.Details
rev. of pa#201211083838 with use of 2 kitchen hoods instead of 1. the use of 2 make up air units and the use of 2 exhaust fans. | |
| May 22, 2013 | Completed final sign-off Feb 2014 | 362 Columbus Av | interior t.i. to extg: basement:storage, sinks, prep area. 1st floor: revise entrance due to ada compliance. 2nd floor:new equipment in extg kitchen. comply with nov # 200669907Details
interior t.i. to extg: basement:storage, sinks, prep area. 1st floor: revise entrance due to ada compliance. 2nd floor:new equipment in extg kitchen. comply with nov # 200669907 | $40,000 |
| Mar 22, 2013 | Never finaled issued Jun 2013, no final | 230 Jones St | remove old kitchen exhaust hood & fan & replace with new exhaust hood & fan. duct & rated shaft enclosure are (e) to remain. hood & duct fire suppresion under sep. permit.Details
remove old kitchen exhaust hood & fan & replace with new exhaust hood & fan. duct & rated shaft enclosure are (e) to remain. hood & duct fire suppresion under sep. permit. | $15,000 |