Back to kitchen remodel contractors
All Bay Cities Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Apr 2026
- Last 24 months
- 5 permits filed
87 permits since 2000: 73 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 20 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off Jun 2025 | 5020 California St | unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior workDetails
unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior work | $50,000 |
| Jan 26, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan.Details
like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan. | $35,000 |
| Jan 21, 2022 | Completed final sign-off Oct 2022 | 1524 Palou Av | revision to bpa 202110281404. convert media room to kitchenette. re-build front stairway. add window and entry at front of 1/f.Details
revision to bpa 202110281404. convert media room to kitchenette. re-build front stairway. add window and entry at front of 1/f. | $23,000 |
| Jun 23, 2021 | Completed final sign-off Apr 2022 | 1809 Union St | new restaurant d.b.a dumpling union. work include new all gender restroom, stair and kitchen equipment.Details
new restaurant d.b.a dumpling union. work include new all gender restroom, stair and kitchen equipment. | $150,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2022 | 461 02nd St | unit #c105: one in-kind kitchen and one bathroom remodel. non-structural workDetails
unit #c105: one in-kind kitchen and one bathroom remodel. non-structural work | $20,000 |
| Oct 3, 2018 | Expired or cancelled withdrawn Nov 2018 | 1250 Jones St | 11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den.Details
11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den. | $60,000 |
| May 22, 2018 | Completed final sign-off May 2021 | 265 Flournoy St | rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition.Details
rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition. | $105,000 |
| Mar 13, 2018 | Completed final sign-off Jan 2019 | 3075 25th Av | convert (e) garage space to have a (n) adu w/ 2 bedrms. 2 full bathes, a kitchen and living/dining area. per ord# 95-17.Details
convert (e) garage space to have a (n) adu w/ 2 bedrms. 2 full bathes, a kitchen and living/dining area. per ord# 95-17. | $38,000 |
| Mar 9, 2018 | Completed final sign-off Jun 2018 | 3075 25th Av | 2nd fl: remodel (e) kitchen and bathroom. add one full bath.Details
2nd fl: remodel (e) kitchen and bathroom. add one full bath. | $20,000 |
| Mar 11, 2016 | Completed final sign-off Apr 2016 | 2801 Sacramento St | unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances.Details
unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances. | $20,000 |
| Nov 24, 2015 | Completed final sign-off Dec 2016 | 263 Vernon St | remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath.Details
remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath. | $100,000 |
| Jun 30, 2015 | Completed final sign-off Dec 2015 | 300 03rd St | unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maherDetails
unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maher | $25,000 |
| Sep 2, 2014 | Completed final sign-off May 2015 | 693 10th Av | remodel existing kitchen and upgrade electrical panelDetails
remodel existing kitchen and upgrade electrical panel | $9,000 |
| Aug 19, 2013 | Completed final sign-off Feb 2014 | 1687 23rd Av | relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor.Details
relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor. | $68,000 |
| Oct 27, 2010 | Completed final sign-off Dec 2010 | 3632 Ulloa St | remodel kitchen on 2nd flr only, non structural lighting to comply with cec 150(k)Details
remodel kitchen on 2nd flr only, non structural lighting to comply with cec 150(k) | $10,000 |
| Jul 15, 2009 | Completed final sign-off Sep 2009 | 2820 Kirkham St | remodel kitchen , no lighting change, change panel to 100a.Details
remodel kitchen , no lighting change, change panel to 100a. | $10,000 |
| Feb 12, 2009 | Completed final sign-off Feb 2009 | 2323 46th Av | to botain a permit of remodel kitchen from previous owner, per inspector's request.Details
to botain a permit of remodel kitchen from previous owner, per inspector's request. | $12,000 |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 343 Wheeler Av | remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture.Details
remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture. | $14,500 |
| May 29, 2007 | Completed final sign-off Sep 2007 | 522 22nd Av | to comply nov #200671972: to remove existing kitchen sink, cabinet in 1/f, turn existing space back to original space per appl#7800449, repair termit damage to existing exterior wood stair.Details
to comply nov #200671972: to remove existing kitchen sink, cabinet in 1/f, turn existing space back to original space per appl#7800449, repair termit damage to existing exterior wood stair. | $3,000 |
| Jan 10, 2007 | Completed final sign-off May 2007 | 220 San Benito Wy | renovate (e) kitchen and bathrooms only on 2nd floor.Details
renovate (e) kitchen and bathrooms only on 2nd floor. | $15,000 |
| Aug 8, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | remodel kitchen cabinets, 8 countertops. replace glazing for 4 existing windows in front buildings windows.Details
remodel kitchen cabinets, 8 countertops. replace glazing for 4 existing windows in front buildings windows. | $2,500 |