Back to bathroom remodel contractors
All Bay Cities Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Apr 2026
- Last 24 months
- 5 permits filed
87 permits since 2000: 73 completed, 1 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 26 completed, 2 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off Jun 2025 | 5020 California St | unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior workDetails
unit 5: interior remodel on 3rd fl: change e) dining rm to a bedroom, remodel e) kitchen & bathroom. no exterior work | $50,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | revision to permit #202201266671. location of range hood will not move(stay the same). no bathroom fan. ste 303Details
revision to permit #202201266671. location of range hood will not move(stay the same). no bathroom fan. ste 303 | $35,000 |
| Feb 15, 2022 | Never finaled issued Mar 2022, no final | 355 01st St | unit # 309: remodel (e) 2 bathroom (no layout change), replace vanities & water closets. replace tiles in shower & bathtub area. replace baths & hallway floor tiles. add 1 gfci receptacle in master bathroom.Details
unit # 309: remodel (e) 2 bathroom (no layout change), replace vanities & water closets. replace tiles in shower & bathtub area. replace baths & hallway floor tiles. add 1 gfci receptacle in master bathroom. | $20,000 |
| Jan 26, 2022 | Completed final sign-off Aug 2022 | 1250 Clay St | like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan.Details
like for like 1 kitchen remodel: like kind 1 bathroom remodel: install laminate floors, add 10 recessed light, move location of range hood, install bathroom fan. | $35,000 |
| Oct 28, 2021 | Completed final sign-off Oct 2022 | 1524 Palou Av | 1/f: add media room, bathroom, office & family, & laundry room.Details
1/f: add media room, bathroom, office & family, & laundry room. | $45,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2022 | 461 02nd St | unit #c105: one in-kind kitchen and one bathroom remodel. non-structural workDetails
unit #c105: one in-kind kitchen and one bathroom remodel. non-structural work | $20,000 |
| Oct 3, 2018 | Expired or cancelled withdrawn Nov 2018 | 1250 Jones St | 11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den.Details
11th fl: remodel kitchen, bathroom, add sink in powder room, add washer/dryer, add den. | $60,000 |
| May 22, 2018 | Completed final sign-off May 2021 | 265 Flournoy St | rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition.Details
rear yard addition. remodel kitchen, bathrooms, floor finish, rear yard addition 2-story (270x2=540 sf) 2 bed/2 bath. expand kitchen with addition of 50 sf, new spiral stairs to ground floor. ground floor with (1) bed & (1) bath, family room. upstairs office 50 sf addition. | $105,000 |
| Mar 9, 2018 | Completed final sign-off Jun 2018 | 3075 25th Av | 2nd fl: remodel (e) kitchen and bathroom. add one full bath.Details
2nd fl: remodel (e) kitchen and bathroom. add one full bath. | $20,000 |
| Dec 11, 2017 | Completed final sign-off Feb 2018 | 88 King St | remodel bathroom, same location, no moving of walls, doors or windows, maintain accessible heights & clearances if it is an accessible unit; maher ord 155=13 na.Details
remodel bathroom, same location, no moving of walls, doors or windows, maintain accessible heights & clearances if it is an accessible unit; maher ord 155=13 na. | $8,000 |
| Aug 16, 2017 | Completed final sign-off Dec 2017 | 2575 39th Av | 2/f: remodel bathroom.Details
2/f: remodel bathroom. | $8,500 |
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 88 King St | unit #302 - remodel a bathroom.Details
unit #302 - remodel a bathroom. | $8,000 |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 1776 Sacramento St | remodel 2 bathrooms, no change on walls.Details
remodel 2 bathrooms, no change on walls. | $10,000 |
| Mar 11, 2016 | Completed final sign-off Apr 2016 | 2801 Sacramento St | unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances.Details
unit #3: upgrade kitchen, counter top,sink,change one bath tub, 1 sink , no change existing appliances. | $20,000 |
| Nov 24, 2015 | Completed final sign-off Dec 2016 | 263 Vernon St | remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath.Details
remodel upper stair kitchen/bathroom. add one bath on 2nd floor. garage level convert into 2 bedrooms, one bath, and 1 car parking. basement cellars convert into 2 beds and one bath. | $100,000 |
| Jun 30, 2015 | Completed final sign-off Dec 2015 | 300 03rd St | unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maherDetails
unit #318: remodel extg kitchen, bathrooms only. new floor finishes. n/a for maher | $25,000 |
| Oct 30, 2014 | Completed final sign-off May 2015 | 2779 38th Av | in 1st flr: convert (e) rooms to have two bedrooms, one full bath, laundry areaDetails
in 1st flr: convert (e) rooms to have two bedrooms, one full bath, laundry area | $45,000 |
| Dec 27, 2013 | Completed final sign-off Jul 2014 | 708 Plymouth Av | add 1 new bathroom. family room and bedroom at gr fl per planDetails
add 1 new bathroom. family room and bedroom at gr fl per plan | $30,000 |
| Aug 19, 2013 | Completed final sign-off Feb 2014 | 1687 23rd Av | relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor.Details
relocate kitchen & convert (e) kitchen into (n) study/office room at 2nd floor. legalize one bedroom, & (e) bathroom, construct one new bedroom, one bathroom & infill under (e) sunroom at ground floor. | $68,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 1849 23rd Av | to add a family room, a full bath, laundry room for sfd ue only.Details
to add a family room, a full bath, laundry room for sfd ue only. | $35,000 |
| Mar 16, 2012 | Completed final sign-off Jun 2012 | 2463 37th Av | to legalize extg guest bedroom, family room and 2 baths at ground floor.Details
to legalize extg guest bedroom, family room and 2 baths at ground floor. | $38,000 |
| Oct 16, 2008 | Completed final sign-off Feb 2009 | 2323 46th Av | interior remodeling . add bath room to ground floor. remodel family room on ground floor and remove interior stair. 2nd floor add a new bath . to legalize ground floorDetails
interior remodeling . add bath room to ground floor. remodel family room on ground floor and remove interior stair. 2nd floor add a new bath . to legalize ground floor | $19,000 |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 343 Wheeler Av | remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture.Details
remodel (e) kitchen & bathroom. tile floor on bathroom kitchen. new cabinet & counter top with back flashing. new plumbing fixture. | $14,500 |
| Sep 11, 2007 | Completed final sign-off Jan 2008 | 40 Gellert Dr | add full bath @ ground floor.Details
add full bath @ ground floor. | $6,000 |
| Mar 22, 2007 | Completed final sign-off Aug 2007 | 2219 47th Av | interior renovation: to add a family room, a bath. remodel (e) bath, bedroom in lower (1st floor). repair (e) rear deck and stair. (horizontal addition)Details
interior renovation: to add a family room, a bath. remodel (e) bath, bedroom in lower (1st floor). repair (e) rear deck and stair. (horizontal addition) | $20,000 |
| Jan 10, 2007 | Completed final sign-off May 2007 | 220 San Benito Wy | renovate (e) kitchen and bathrooms only on 2nd floor.Details
renovate (e) kitchen and bathrooms only on 2nd floor. | $15,000 |
| Oct 30, 2006 | Completed final sign-off Mar 2007 | 300 Country Club Dr | to legalize bathroom in 1st floor for single family use onlyDetails
to legalize bathroom in 1st floor for single family use only | $6,000 |
| May 15, 2006 | Completed final sign-off Sep 2006 | 191 Evelyn Wy | install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor.Details
install 1 bedroom, 1 laundry room & 1 bathroom at garage floor. legalize storage rooms & 1 bathroom at garage floor. install 1 bathroom at 2nd floor. | $25,000 |
| Oct 30, 2001 | Completed final sign-off Jan 2002 | 1259 Oak St | change bathroom tile floor. tub wallDetails
change bathroom tile floor. tub wall | $2,800 |