Back to kitchen remodel contractors
Alive Design & Construction
- Based in
- Moraga
- On San Francisco permits
- Feb 2007 to Feb 2025
- Last 24 months
- 1 permit filed
31 permits since 2000: 20 completed, 1 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 7 completed, 1 in progress, 1 never finaled, 3 expired or cancelled. Typically 27 days from filing to permit and 334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2025 | In progress issued Apr 2025 | 601 Laguna Honda Bl | interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening.Details
interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening. | $108,000 |
| Apr 19, 2023 | Completed final sign-off Apr 2024 | 2472 21st Av | bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code.Details
bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code. | $100,000 |
| Oct 7, 2020 | Expired or cancelled withdrawn Apr 2023 | 2472 21st Av | in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16.Details
in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16. | $250,000 |
| Mar 14, 2019 | Never finaled issued Apr 2019, no final | 1429 Mendell St | install new hvac unit on roof. no work involving kitchen exhaust hood system.Details
install new hvac unit on roof. no work involving kitchen exhaust hood system. | $25,000 |
| Apr 5, 2016 | Completed final sign-off Nov 2017 | 1875 38th Av | remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/denDetails
remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/den | $205,000 |
| Nov 25, 2014 | Completed final sign-off Feb 2016 | 264 Evelyn Wy | ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rearDetails
ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rear | $200,000 |
| Jan 16, 2014 | Completed final sign-off Jun 2014 | 900 22nd St | install new kitchen hood, duct work, extractor and makeup air motors on roof. ref app#201310310809Details
install new kitchen hood, duct work, extractor and makeup air motors on roof. ref app#201310310809 | $8,000 |
| Nov 5, 2013 | Completed final sign-off Apr 2014 | 1900 08th Av | remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor.Details
remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor. | $40,000 |
| Oct 31, 2013 | Completed final sign-off Jun 2014 | 900 22nd St | revision to pa# 2011-0321-2470-relocation of bar counter & kitchen equipment layout per application referred to aboveDetails
revision to pa# 2011-0321-2470-relocation of bar counter & kitchen equipment layout per application referred to above | $10,000 |
| Oct 17, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | install a 10' hood in the kitchen.Details
install a 10' hood in the kitchen. | $10,000 |
| Aug 25, 2011 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | remodel kitchen, install 2 new ada accessible rest rooms, add 1-hr. corridor.Details
remodel kitchen, install 2 new ada accessible rest rooms, add 1-hr. corridor. | $40,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2014 | 900 22nd St | change of use from coffee house to full service restaurant. interior tenant improvement. remodel (e) kitchen to include class i hood & associated cooking equipment. light plumbing & electrical included.Details
change of use from coffee house to full service restaurant. interior tenant improvement. remodel (e) kitchen to include class i hood & associated cooking equipment. light plumbing & electrical included. | $18,000 |