Back to bathroom remodel contractors
Alive Design & Construction
- Based in
- Moraga
- On San Francisco permits
- Feb 2007 to Feb 2025
- Last 24 months
- 1 permit filed
31 permits since 2000: 20 completed, 1 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 6 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2025 | In progress issued Apr 2025 | 601 Laguna Honda Bl | interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening.Details
interior remodeling, new bath and family room at car/basement remodel kitchen and bath at level 1. remodel master bath at level 2. exterior add (2) window basement. 1 (n) door at ground level. replace 9 (e) window in kind. 2 visible at basmnt alum window clad wood.voluntary sesimic strengthening. | $108,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 2472 21st Av | rev to pa# 2023-0419-6015: all new laundry hook in the upper level remodel (e) half bathroom new smn new tolilet replace bathroom windows to meet code tempered glass requiredDetails
rev to pa# 2023-0419-6015: all new laundry hook in the upper level remodel (e) half bathroom new smn new tolilet replace bathroom windows to meet code tempered glass required | |
| Apr 19, 2023 | Completed final sign-off Apr 2024 | 2472 21st Av | bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code.Details
bathroom and kitchen remodel in-kind, upgrade hvac and electrical per code. | $100,000 |
| Oct 7, 2020 | Expired or cancelled withdrawn Apr 2023 | 2472 21st Av | in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16.Details
in law addition in the basement(1st floor as marked on plans) and 1/2 bath addition in the existing floor, kitchen remodel and bath remodel in the 1st floor. adu per ordinance no. 162-16. | $250,000 |
| Apr 5, 2016 | Completed final sign-off Nov 2017 | 1875 38th Av | remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/denDetails
remodel kitchen & bath; add (2)(n) bathrooms; rear addition; remodel (e) multipurpose room/den | $205,000 |
| Nov 25, 2014 | Completed final sign-off Feb 2016 | 264 Evelyn Wy | ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rearDetails
ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rear | $200,000 |
| Nov 5, 2013 | Completed final sign-off Apr 2014 | 1900 08th Av | remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor.Details
remodel kitchen and install toilet room at 1st floor and replace bathroom fixtures at 2nd floor. | $40,000 |
| Jan 20, 2012 | Expired or cancelled expired Mar 2016 | 1429 Mendell St | as-built floor plan & revised bathroom layout @ men's.Details
as-built floor plan & revised bathroom layout @ men's. | |
| Mar 5, 2007 | Completed final sign-off Jun 2007 | 1050 North Point St | remove old bath tub/new frame work for the new tub. install new valves and new tub. minor tile repair work. install new light fixture. install new medicine cabinetsDetails
remove old bath tub/new frame work for the new tub. install new valves and new tub. minor tile repair work. install new light fixture. install new medicine cabinets | $6,000 |