Permit GraphShortlistSan Francisco building permits since 2000

Alexander Ross

Contractor license
997758
State license record
Based in
Los Gatos
On San Francisco permits
Jan 2021 to Apr 2021
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 1Bathroom remodel 1

1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 195 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 15, 2021Completed
final sign-off Jul 2021
411 Francisco St1st fl. replace finishes that have been abated including sheetrock, tape and mud, base cabinets in kitchen and bathroom, install countertops and top out plumbing new to be planked floor on first floor only, all scope to be like for like
Details
Permit
202101152796
Status
complete
Filed
Jan 15, 2021
Permit issued
Jan 15, 2021
Final sign-off
Jul 29, 2021
Declared cost
$40,000
Address
411 Francisco St

1st fl. replace finishes that have been abated including sheetrock, tape and mud, base cabinets in kitchen and bathroom, install countertops and top out plumbing new to be planked floor on first floor only, all scope to be like for like

Open the permit page

$40,000