Back to bathroom remodel contractors
Alexander Ross
- Based in
- Los Gatos
- On San Francisco permits
- Jan 2021 to Apr 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2021 | Completed final sign-off Jul 2021 | 411 Francisco St | 1st fl. replace finishes that have been abated including sheetrock, tape and mud, base cabinets in kitchen and bathroom, install countertops and top out plumbing new to be planked floor on first floor only, all scope to be like for likeDetails
1st fl. replace finishes that have been abated including sheetrock, tape and mud, base cabinets in kitchen and bathroom, install countertops and top out plumbing new to be planked floor on first floor only, all scope to be like for like | $40,000 |