Alex He General Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Sep 2026
- Last 24 months
- 7 permits filed
36 permits since 2000: 33 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 expired or cancelled. Typically 1498 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 20, 2022 | Expired or cancelled cancelled Jan 2026 | 218 Amber Dr | reduction of scope of work 2 stories side additon (1) story additon with roof deckDetails
reduction of scope of work 2 stories side additon (1) story additon with roof deck | |
| Sep 11, 2018 | Expired or cancelled cancelled Mar 2025 | 218 Amber Dr | (2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair.Details
(2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair. | $300,000 |