Back to bathroom remodel contractors
Alex He General Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Sep 2026
- Last 24 months
- 7 permits filed
36 permits since 2000: 33 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 20 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Jan 2026 | 720 26th Av | remove and reinstall all drywalls and update electrical wiring for 2nd floor (approx 1000sf). r15 for exterior wall and r30 for attic. replace 8 vinyl windows not street facing. bathroom remodel, no layout changes. concrete shower pan.Details
remove and reinstall all drywalls and update electrical wiring for 2nd floor (approx 1000sf). r15 for exterior wall and r30 for attic. replace 8 vinyl windows not street facing. bathroom remodel, no layout changes. concrete shower pan. | $40,000 |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 1212 24th Av | remodel & enlarge 2nd fl bathroom, add insulation on exterior wall on 2nd fl bedroom adjacent to bathroom. concrete slab shower pan. readjust height on e) windowDetails
remodel & enlarge 2nd fl bathroom, add insulation on exterior wall on 2nd fl bedroom adjacent to bathroom. concrete slab shower pan. readjust height on e) window | $12,000 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 517 Paris St | convert storage into habitable space on ground floor to include 1 bedroom, 1 office, and 1 bath.Details
convert storage into habitable space on ground floor to include 1 bedroom, 1 office, and 1 bath. | $40,000 |
| Jan 11, 2024 | Completed final sign-off Apr 2024 | 2379 27th Av | unit 1: bathroom remodel- no layout changes, cosmetic upgrade.Details
unit 1: bathroom remodel- no layout changes, cosmetic upgrade. | $12,000 |
| Sep 27, 2023 | Completed final sign-off Feb 2024 | 1300 Sacramento St | unit# 106; kitchen and bathroom remodel in kind. no layout changes, cosmetic upgrades only. no structural work. no floor layout changes. no wall layout changes.Details
unit# 106; kitchen and bathroom remodel in kind. no layout changes, cosmetic upgrades only. no structural work. no floor layout changes. no wall layout changes. | $15,000 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 2379 27th Av | unit 6: one kitchen and one bathroom remodel, no layout changes, cosmetic upgrade only. prefabricated shower panDetails
unit 6: one kitchen and one bathroom remodel, no layout changes, cosmetic upgrade only. prefabricated shower pan | $20,000 |
| May 11, 2022 | Completed final sign-off Jul 2022 | 1422 Powell St | unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall.Details
unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall. | $6,000 |
| Apr 14, 2022 | Completed final sign-off Oct 2022 | 2379 27th Av | unit #3: kitchen (100 sf) and bathroom (40 sf) remodel: no layout changes, cosmetic upgrade only. replace (9) rear windows (vinyl) same size, non street facing.Details
unit #3: kitchen (100 sf) and bathroom (40 sf) remodel: no layout changes, cosmetic upgrade only. replace (9) rear windows (vinyl) same size, non street facing. | $20,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 1634 Oakdale Av | partially comply with nov 202185665. 3/f: kitchen & bath remodel. windows replace in kind @ 3rd fl. onlyDetails
partially comply with nov 202185665. 3/f: kitchen & bath remodel. windows replace in kind @ 3rd fl. only | $35,000 |
| Jan 18, 2022 | Completed final sign-off May 2022 | 1300 Sacramento St | apartment #204 studio remodel: kitchen and bathroom remodel. no layout changes. no structural.Details
apartment #204 studio remodel: kitchen and bathroom remodel. no layout changes. no structural. | $15,000 |
| Nov 19, 2021 | Completed final sign-off Jun 2022 | 39 Chicago Wy | 1/f: remodel, reduce extg garage area to provide new office and bath.Details
1/f: remodel, reduce extg garage area to provide new office and bath. | $60,000 |
| Apr 19, 2021 | Completed final sign-off Dec 2021 | 530 36th Av | bathroom remodel. no layout changes or removal of walls. change light fixtures,outlet and covers. facucets, painting cosmetic upgradesDetails
bathroom remodel. no layout changes or removal of walls. change light fixtures,outlet and covers. facucets, painting cosmetic upgrades | $5,000 |
| Apr 19, 2021 | Completed final sign-off May 2021 | 1300 Sacramento St | apartment unit 101 remodel kitchen and bathroom remodel. no layout changes or removal of walls. change light fixtures, outlet and covers, faucets. cosmetic upgrades, paintingDetails
apartment unit 101 remodel kitchen and bathroom remodel. no layout changes or removal of walls. change light fixtures, outlet and covers, faucets. cosmetic upgrades, painting | $10,000 |
| Jan 19, 2021 | Completed final sign-off Feb 2021 | 1322 20th Av | remodel bathroom - new tiles/ floors, new shower door & new prefabricated shower panDetails
remodel bathroom - new tiles/ floors, new shower door & new prefabricated shower pan | $3,000 |
| Dec 4, 2020 | Completed final sign-off Feb 2021 | 1300 Sacramento St | unit#201: apartment unit 201 remodel: kitchen and bathroom remodel. no fixture or strctural changes. all remodel work in-kind. no removal of walls.Details
unit#201: apartment unit 201 remodel: kitchen and bathroom remodel. no fixture or strctural changes. all remodel work in-kind. no removal of walls. | $10,000 |
| Aug 31, 2020 | Completed final sign-off Jan 2022 | 2559 26th Av | add 1 bedroom, 1 playroom and full bath & laundry, storage area at the (e) ground floor.Details
add 1 bedroom, 1 playroom and full bath & laundry, storage area at the (e) ground floor. | $50,000 |
| Jun 4, 2020 | Completed final sign-off Jul 2020 | 1300 Sacramento St | unit#305: apartment remodel, kitchen and bathroom remodel. no fixture or structural changes. all remodel work in-kind.Details
unit#305: apartment remodel, kitchen and bathroom remodel. no fixture or structural changes. all remodel work in-kind. | $10,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2020 | 1300 Sacramento St | unit # 306: apartment studio remodel: kitchen and bathroom remodel. no fixture change. no structural work under this permit.Details
unit # 306: apartment studio remodel: kitchen and bathroom remodel. no fixture change. no structural work under this permit. | $4,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2020 | 1425 Clay St | unit #a: whole apartment remodeling. kitchen and bathroom remodel. new dry wall and insulation. change outlets. new heating system. no layout changes.Details
unit #a: whole apartment remodeling. kitchen and bathroom remodel. new dry wall and insulation. change outlets. new heating system. no layout changes. | $30,000 |
| Dec 5, 2017 | Completed final sign-off Feb 2020 | 2589 San Bruno Av | legalize unit on ground floor of property w/ (4) bedrooms, kitchen, living room & (3) full bathroom per plan ord #43-14Details
legalize unit on ground floor of property w/ (4) bedrooms, kitchen, living room & (3) full bathroom per plan ord #43-14 | $18,000 |