Back to kitchen remodel contractors
Alder Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2021 to Aug 2026
- Last 24 months
- 13 permits filed
36 permits since 2000: 30 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 in progress. Typically 1 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1865 California St | unit 3- kitchen remodel in kind like for like. update cabinetrym countertops, appliances, (n) lighting, refinish repaint. no wall removal or layout change.Details
unit 3- kitchen remodel in kind like for like. update cabinetrym countertops, appliances, (n) lighting, refinish repaint. no wall removal or layout change. | $60,000 |
| Jun 26, 2025 | In progress issued Dec 2025 | 2122 34th Av | kitchen remodel w (n) appliances. bathroom remodel w(n) fixtures; replace (e) courtyard window; enclose (e) lightwell. minor modifications to interior wallsDetails
kitchen remodel w (n) appliances. bathroom remodel w(n) fixtures; replace (e) courtyard window; enclose (e) lightwell. minor modifications to interior walls | $102,515 |
| Apr 10, 2025 | Completed final sign-off Mar 2026 | 575 Ellsworth St | kitchen, dining, and living room renovation including adding a skylight, replace windows. removing existing porch, relocating kitchen plumbing, recessed lighting, new rated door into garage and replace sectional garage door. kitchen remodel, new skylightDetails
kitchen, dining, and living room renovation including adding a skylight, replace windows. removing existing porch, relocating kitchen plumbing, recessed lighting, new rated door into garage and replace sectional garage door. kitchen remodel, new skylight | $132,598 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 5326 California St | revision to pa 202405202506; add laundry & remove closet at 1st fl; add (n) header @ (e) opening on 2nd floor; change wood header to steel @ kitchen door & windows. reframe (e) exterior wall @ 3rd fl bathDetails
revision to pa 202405202506; add laundry & remove closet at 1st fl; add (n) header @ (e) opening on 2nd floor; change wood header to steel @ kitchen door & windows. reframe (e) exterior wall @ 3rd fl bath | $15,000 |
| May 20, 2024 | Completed final sign-off Feb 2026 | 5326 California St | demo (e) 3 story bump-out over roof deck in rear yard. remodel (e) kitchen and baths. interior remodel at 3rd floor. no expansion of building envelope or work visible from street.Details
demo (e) 3 story bump-out over roof deck in rear yard. remodel (e) kitchen and baths. interior remodel at 3rd floor. no expansion of building envelope or work visible from street. | $250,000 |
| Apr 30, 2024 | Completed final sign-off Feb 2025 | 522 Roosevelt Wy | 3/f and 4/f unit 2: replacement of interior doors and hardware. few new electrical outlets and light fixtures. remodel in-kitchen and bathrooms. replacement of furnace, water heater, washer dryer, stove at existing locations.Details
3/f and 4/f unit 2: replacement of interior doors and hardware. few new electrical outlets and light fixtures. remodel in-kitchen and bathrooms. replacement of furnace, water heater, washer dryer, stove at existing locations. | $149,500 |
| Jul 19, 2023 | Completed final sign-off Apr 2024 | 40 Piedmont St | 1st/f: kitchen remodel, new appliances, new built in bench @ dining. 2nd/f: convert bedroom 4 to master bath & walking closet. (e) bedroom 3 convert to master bedroom. master bathroom install two new windows.Details
1st/f: kitchen remodel, new appliances, new built in bench @ dining. 2nd/f: convert bedroom 4 to master bath & walking closet. (e) bedroom 3 convert to master bedroom. master bathroom install two new windows. | $150,000 |
| Dec 14, 2022 | Completed final sign-off Jun 2023 | 1254 06th Av | 1/f: remodel kitchen in rear of building. no change in square footageDetails
1/f: remodel kitchen in rear of building. no change in square footage | $68,000 |
| Oct 24, 2022 | Completed final sign-off Jan 2023 | 2125 Bryant St | replacing flooring, kitchen cabinets, and countertops in kind, due to water damage- all locations remain the same.Details
replacing flooring, kitchen cabinets, and countertops in kind, due to water damage- all locations remain the same. | $20,000 |
| Jun 7, 2022 | Completed final sign-off Jan 2023 | 205 09th Av | kitchen & bath remodel in place. reconfigure non-bearing walls.Details
kitchen & bath remodel in place. reconfigure non-bearing walls. | $20,000 |